Newgrove, Monaghan, Co. Monaghan, Monaghan
Newgrove, Monaghan, Co. Monaghan
planning permission for the infilling of lands with imported inactive or inert waste (app. 6220m³) to a maximum depth of 2.4m over 0.80Ha, accessed off existing entrance, finished with topsoil and grassed over on completion, together with all ancillary & associated site works
- Objective SSO 22 of the Monaghan County Development Plan 2025-2031 seeks “To apply the precautionary principle in relation to development on lands identified as being at risk of flooding and to restrict development to uses that are compatible to the level of flood risk unless supported by a site-specific flood risk assessment and development management justification test”. Policy FRP 1 states “Proposals for developments shall comply with Section 15.22.8 of the Monaghan County Development Plan 2025-2031”. Section 15.22.8 states “Monaghan County Council will restrict development in areas susceptible to flooding except where: a) The proposed development can be justified on strategic grounds. b) The proposed development has addressed the flooding concerns which exist. c) The flood risk can be managed to an acceptable degree and without increasing flood risk beyond the site itself. d) Appropriate and detailed mitigation measures can be implemented to remove/minimise flood effects. The proposal has failed to adequately demonstrate how the potential for flooding from prolonged rainfall events can be managed to an acceptable degree and without increasing flood risk beyond the site itself, and as a result there is a risk that increased water levels would ultimately occur on third party lands as a direct consequence of the infilling of the site area. Consequently, to permit the development as proposed would be contrary to Objective SSO 22 and Policy FRP 1 of the Monaghan County Development Plan 2025-2031 and thus would be contrary to the proper planning and sustainable development of the area.
- Policy ILP 1 seeks to ensure that ‘Development proposals for infilling of lands shall comply with Section 15.32 of the Monaghan County Development Plan 2025 – 2031, and that development proposals for the infilling of lands with inert construction and demolition waste will only be acceptable where it is demonstrated to the satisfaction of the Planning Authority that there will be no adverse impact upon surface and ground waters, or upon areas which are at risk of flooding. Proposals for the prevention and mitigation of any perceived impacts shall satisfy the targets of any Waterbody and Catchment Management Plans developed by Group Water Schemes. Proposals for infilling of lands at risk of flooding will be required to be accompanied by a site-specific Flood Risk Assessment in accordance with Section 15.22.8 of Chapter 15 of this Development Plan. The proposal has failed to adequately demonstrate how the proposed fill materials will be accepted, stored or utilised, or to determine the total volume of both types of material to be accepted, and therefore, the proposal has not demonstrated that the there will be no adverse impact upon surface and ground waters, or upon areas that are at risk of flooding. Consequently, to permit the development as proposed would be contrary to Policy ILP 1 of the Monaghan County Development Plan 2025-2031 and thus would be contrary to the proper planning and sustainable development of the area.