288 commencement notices give a start date this week, for 265 projects on PlanningBrief. Each is counted by the start date on the notice, not the day we added it.
Largest projects starting this week
Linked projects · largest stated units, never a sumAll commencement notices in the latest update
288 recordsTipperary, Tipperary
construction of a new single storey extension to rear of existing house
Lucan, Dublin
New dormer bungalow & associated site works
Monasterboice, Louth
Restoration and Adaption of stone cottage, single storey extension to same, proprietary waste water treatment system/percolation area and associated site works.
Dunmore East, Waterford
to construct a first floor extension to existing house which will comprise alterations of an existing flat roof to a pitched roof and the replacement of existing terrace doors at first floor level with a window on the northern facing elevation in accordance with the drawings submitted.
Whitfield, Waterford
Single storey dwelling, with site entrance, driveway, borehole, domestic sewage treatment plant and percolation area and all other ancillary works.
Kilreekill, Galway
Construction of dwelling house
Kilreekill, Galway
Construction of Dwelling
Goold's Cross, Cashel, Tipperary
Construction of a a storey and a half type extension to existing dwelling
Ballybay, Monaghan
The works involve the renovation and conversion of an existing stone building from a men’s shed into a new community facility, including structural, mechanical, electrical, fire safety, and internal fit-out works. The project also includes drainage upgrades, new finishes, and the protection and refurbishment of existing protected features throughout.
Dublin 11, Dublin
Construction of a Type 2D Modular school building consisting of 2No SEN classrooms and multi-activity room and all associated works
Ballyhooly, Cork
Change of use from public house to 5 no. apartments and 1 no. retail unit, consisting of 4 no. 1 bed apartments and 1 no. 2 bed apartment with material alterations to the existing building and all associated site works.
Bray, Dublin
Construction of a five storey apartment block consisting of 31no. apartments and all associated site works.
Cobh, Cork
The proposed works comprise material alterations and a change of use of the existing ground floor and first floor licensed bar and restaurant to provide 2 no. apartments.
Blessington, Wicklow
FSC Ref BC 4490/2022, commencement notice Ref No. 3007864. Construction of a duplex apartment building to include first unit (Type D1) which is a single storey ground floor apartment accessed directly from outside and a second unit (Type D2) which is an apartment with an independent external entrance via stairs that lead directly to outside at ground level at No.95-96 and No.100-101, Burgage More, Blessington, Co.Wicklow. The building is further identified as part of Terrace 21 within Block 4.
Blessington, Wicklow
FSC Ref BC 4486/2022, commencement notice Ref No. 3007861. Construction of a duplex apartment building to include first unit (Type D1) which is a single storey ground floor apartment accessed directly from outside and a second unit (Type D2) which is an apartment with an independent external entrance via stairs that lead directly to outside at ground level at No.85-86 and No.90-91, Burgage More, Blessington, Co.Wicklow. The building is further identified as part of Terrace 19 within Block 4.
Blessington, Wicklow
FSC Ref BC 4495/2022, commencement notice Ref No. 3007858. Construction of a duplex apartment building which includes 2 single storey apartments located on the ground level (Type C1), and 2 single storey apartments located on the first floor (Type C2). All apartments will be accessed directly from the outside at No.62-63 and No.72-73 at Burgage More, Blessington, Co.Wicklow. The building is now identified as No.60-61 and No.70-71, part of Terrace 17 within Block 3.
Cork, Cork
Construction of a two-classroom single storey extension and alterations to Scoil Ursula Primary School, an existing school, and all associated site works.
Blessington, Wicklow
FSC Ref BC 4494/2022, commencement notice Ref No. 3007857. Construction of a duplex apartment building which includes 2 single storey apartments located on the ground level (Type C1), and 2 single storey apartments located on the first floor (Type C2). All apartments will be accessed directly from the outside at No.59-60 and No.75-76 at Burgage More, Blessington, Co.Wicklow. The building is now identified as No.73-74 and No.83-84, part of Terrace 15 within Block 3.
Rahoon Road, Galway
To construct 1no. new single storey ICF Built private dwelling at Mincloon, Rahoon Road, Galway
Kingscourt, Cavan
Construction of extensions to the existing single storey cottage comprising of a living/dining space, bedroom, WC and the conversion of existing shed structure for use as a bedroom. - Demolitions of existing single storey extension and ancillary structures - Proposed new extension to existing dwelling. Approx. 69m sq - Conversion of existing ancillary structure - Alterations to existing roof structures - Associated site works including levelling of existing garden and driveway
Kilmeage, Kildare
(A) construction of a two storey type house, (B) garage / store for domestic use, (C) the installation of an Oakstown BAF wastewater treatment system with polishing filter percolation area, and (D) Upgrading works to the existing farm entrance gateway and all associated site works
Clonmel, Tipperary
20 no. New 2 bed bungalows and repairs to existing lodge house
Carrickmacross, Monaghan
THE CONSTRUCTION OF 22 No. DWELLINGS IN PHASE 1 OF A 71 No. DWELLING RESIDENTIAL DEVELOPMENT. PHASE 1 WILL COMPRISE THE FOLLOWING: 1 No. two-storey 4-bed detached dwelling; 3 No. two-storey 3-bed detached dwellings; 16 No. two-storey 3-bed semi-detached dwellings; and 2 No. storey-and-a-half 4-bed detached dwellings. WORKS ALSO INCLUDE A NEW VEHICULAR ENTRANCE FROM THE EXISTING PUBLIC ROAD, NEW PEDESTRIAN FOOTPATH CONNECTIONS, CONNECTIONS TO MAINS SERVICES INCLUDING WATER, FOUL AND STORM WATER, PROVISION OF OPEN SPACE INCLUDING A NEW PLAYGROUND, LANDSCAPING, BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS.
Ardbraccan Village, Meath
Private residence, install proposed wastewater treatment system and percolation area, install new entrance onto cul-de-sac, including all ancillary works.
Dublin 18, Dublin
Phase 2 construction of new house at site A
Limerick, Limerick
Modification & Extension of 2 storey dewlling house etc.
Dublin, Dublin
Material change of use of an existing 543sqm unit (465 sqm site) from retail use to restaurant use, associated material alterations together with minor elevation alterations to the north (front) elevation signage. All at ground and basement levels in 25 Suffolk St, Dublin, D02 F656.
Ballycumber, Offaly
demolishing an existing cottage and shed building, and permission to construct a new single storey dwelling house, new domestic garage, entrance, septic tank with percolation area and all associated site works to complete the development
Saggart, Dublin
Dormer attic extension at rear of No. 24 Pairc Mhuire Saggart Co. Dublin
Athenry, Galway
change of use of an existing classroom in a national school to a child "Full Day Care Service" as described by TUSLA together with all associated services
Ballybofey, Donegal
Extension on the ground floor to rear of the existing dwelling.
Drumkeen, Donegal
Construction of a New Dwelling House and all associated site works
Ennis, Clare
To construct a dwellinghouse, entrance, wastewater treatment system and soil polishing filter together with all associated site development works and services
Westport, Mayo
Demolition of existing end-of-terrace dwelling house and the construction of a new replacement end-of-terrace house together with associated site works at 22 Pairc na Coille, Westport, County Mayo.
Ennis, Clare
To construct a detached garage.
Charleville, Cork
Construction of a single-storey detached steel storage warehouse, with a concrete yard and associated drainage and attenuation area.
Tuam, Galway
building of a agricultural storage shed, new entrance and roadway into lands and all associated site development works in the townland of Marley tuam, galway
Maigh Cuilinn, Galway
To construct An Opt Out Dwelling and Sewage Treatment at Poll na Cloiche
Milltown, Galway
Construct domestic garage & associated site works
Dunsany, Meath
Construction of 2 storey dwelling and all associated site development works
Tuam, Galway
construct a dwelling house
Trim, Meath
erection of a two storey detached dwelling of masonry construction with waste water treatment system and percolation area at Laracor, Trim, Co. Meath
Milltown, Galway
Construct dwelling house, wastewater treatment system and associated site works
Dublin, Dublin
New external circulation staircase to connect the upper plaza to the lower landscaped plaza, modifications to existing balustrade, landscaping and associated works.
Fermoy, Cork
Construction of single storey detached dwelling house, proprietary treatment system and percolation area, vehicular entrance and all ancillary site works.
Dublin 16, Dublin
The construction of Two - storey extension to side and rear, with attic store upgrade. Dutch hipped roof on side and obscured glazing in rear attic gable window
Cornafunshion, Longford
proposed single storey dwelling formation of new entrance, wastewater treatment system, polishing filter and all ancillary site works where it is now sought for permission to amend the site entrance detail
Boyanna, Westmeath
Construction of an extension, containing two bedrooms and extra living space. The notice will also include changes to the existing elevations and all associated site works and drainage.
Ballina, Mayo
Demolition to top of foundation and reconstruction of detached two storey dwelling house
Mullaghmore, Sligo
Construction of a detached domestic garage and all associated siteworks at Kilkiloge, Mullaghmore, County Sligo.