2,669 recorded by 16 Sep 2026 · Later council validations are not added.
2,669 planning applications were published this week across 26 counties. Together they state 2,109 units, and 2,669 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
104 recordsTullig Beg, Killorglin, Co. Kerry
Retention permission to retain (a) existing old dwelling which has being demolished to accommodate existing new dwelling (b) retain existing private dwelling on site (c) retain the decommissioning of existing septic tank, (d) retain new installed treatment system and polishing filter, and full planning permission to remove existing old derelict shed and remove existing container on site
Ballyoughtragh South Commons, Farranmanagh Knocknaman and Lisheennashingane (Townlands), Milltown County Kerry
REDIII: A 10 year planning permission for a solar farm, 38kV substation and underground cabling grid connection, and energy storage compound with a total area of circa 57 hectares. The proposed development will consist of a solar farm comprising of c.230,000 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 14 no. single storey electrical transformer stations. The energy storage compound will consist of 36 no. containerised energy storage modules and associated plant and equipment, 9 no. transformers and 2 no. auxiliary transformers, 2 no. spare parts containers and 1. no. office unit. Planning permission is also sought for 1 no. 38kV substation and associated electrical compound, including single storey control building, line bay, transformer and accompanying apparatus, and associated grid connection between the proposed substation and Oughtragh 110kV substation comprising 38kV underground electricity cabling of c.3.87km in length to be provided in an excavated trench on private lands and the L11003, L8003 and L80030 public roads, and all associated site development and reinstatement works. The project will also include 33kV underground interconnector electrical cabling within the development site and within the L11003 public road, temporary construction compounds, security fencing, CCTV, access tracks, landscaping (including hedgerow removal and planting), drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 6 no. entrances from the L11003 and L80030, with 1 no. of these entrances used for the temporary construction phase only. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
40 Ballinorig Road, Tralee, Co. Kerry
permission to (a) rebuild existing boundary wall at rear of dwelling, (b) to build a private shed at rear of dwelling, and retention permission to retain the demolition of a pre existing shed on site
Lackabane, Killarney, Co. Kerry
construct 4-3bedroom semi-detached dwellings and eight car parking spaces, together with all private amenity spaces, ancillary services, and associated site works
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 31 Aug 2026–6 Sep 2026.