Refusal decisions · 21–27 Sep 2026

61Refusals
43Substantive reasons
3Verification only
1Document not published
5Portal unavailable
9Manual review

What this means

Applications were most often refused because the proposal did not fit its site or surroundings, harmed the amenity of neighbouring homes, conflicted with zoning or rural-housing policy, created access or road-safety problems or lacked enough technical evidence to demonstrate its impacts were acceptable.

43 of 61 records carry official reason text

81 published statements, 1.9 per analysed application

23 refused on more than one ground, up to 5

Most common pairs

  1. 16 Design + Residential amenity
  2. 14 Design + Zoning/policy
  3. 12 Design + Transport/access

All ten refusal themes

Applications · statements
  1. 01 Design, scale, character or visual impact 30
  2. 02 Residential amenity, privacy, light or noise 21
  3. 03 Zoning, land use, settlement policy or rural housing need 20
  4. 04 Traffic, access, parking or road safety 14
  5. 05 Missing or insufficient evidence, surveys or technical detail 14
  6. 06 Unauthorised development, retention or procedural history 11
  7. 07 Built heritage or archaeology 9
  8. 08 Wastewater, effluent, groundwater or public health 6
  9. 09 Surface-water drainage or flood risk 4
  10. 10 Ecology, habitats or Natura impacts 3

Refusal decisions · 21–27 Sep 2026

0 of 0 cards shown · 46 case links · 0 linked projects