Latest planning applications.
908 recorded by 11 Oct 2026 · Later council validations are not added.
908 planning applications were published this week across 26 counties. Together they state 3,076 units, and 908 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
55 recordsThe figures at the top of this page are for all of Ireland; this list shows Galway only.
Parkmore West Business Park, Parkmore, Co. Galway
#3048698 - Construction of a storage building
Castlegar Village, Castlegar, Galway
Permission for development which consists of: to construct a single dwelling house and domestic garage at Castlegar Village, Galway(previously granted under Pl. Ref. No. 21/46 but now expired).
Cloonnacartan, Recess, Interface Inagh, County Galway, H91VW58
for four detached single storey residential artists studios including a shared kitchen and dining space, access pathways, external deck and minor landscaping works, native species planting and the construction of a new effluent treatment system and ancillary works to serve both the residential studios and the adjacent existing hatchery building. A Natura Impact Statement (NIS) is in included in this application
Cill Éinne, Kilronan, Inishmore, Aran Islands
for a new dwelling house (221 sqm), domestic garage/store (40sqm), wastewater tertiary treatment system, polishing filter and all ancillary site works. The proposed Gross Floor Area of the development is 261sqm. The Planning Application will be accompanied by a Natura Impact Statement
Lands off the Sandy Road, Terryland, Galway, Co. Galway
Permission for development which consists of: “Retention permission for the development of a 24-hours opening Electric Vehicle (EV) charging hub on lands off the Sandy Road of approximately 0.28 hectares in size. The development includes a total of 18 no. charging bays served by 3 no. DC units, 2 no. dispensers and 4 no. dual AC posts. The development for which permission is sought also includes for branded, non-illuminated signage illustrating ‘Brite Ultra Rapid’ charging located to the front entrance of the site, in addition to signage mounted on the substation at entranceway. Other associated works for which retention permission is sought include the provision of an ESB sub-station (11.5sqm); widening and upgrading of existing vehicular entrance onto Sandy Road, in addition to footpath upgrade works; provision of CCTV cameras and all other ancillary site development, utilities, landscaping, lighting, and boundary works.”
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 28 Sep 2026–4 Oct 2026.