1,572 cases on record, 1,305 decided. Newest first.
Major projects decided by An Coimisiún Pleanála: strategic infrastructure, local authority projects, compulsory acquisition and more. They go straight to An Coimisiún Pleanála, not to a council. Check the official case file before you act.
located in the townlands of Rathmorrissy, Pollnagroagh, Moanbaun, Castlelambert, Knocknacreeva, Caraunduff, Caherbriskaun, Lisheenkyle East, Barrettspark, Cashla, Athenry, County Galway.
Planning permission for a 220kV Substation and 220kV underground electricity cabling connecting to the existing Cashla 220kV substation
Strategic infrastructureCase 324161Offaly County Council
N24 Carrick Road Improvement Scheme consisting of the realignment of a 2.2km section of the N24 to remove a series of bends to the west of Mooncoin, Co. Kilkenny.
Strategic infrastructureCase 324156Clare County Council
located in the townlands of Cahermurphy, Cloonwhite South, Sheeaun, Leitrim, Cloonreddan, Kilmacduane East, Clooncullin, Lissanair, Teernagloghane, Brisla East and West, Gowerhass, Tullagower and others, County Clare.
Strategic infrastructureCase 324155Clare County Council
located in the townlands of Cahermurphy, Carrowmagry South, Castlepark, Caheraghacullin, Doolough, Drummin, Kilmihil and Knocknahila More South, County Clare.
10 year planning permission for Cahermurphy Wind Farm consisting of 8 no. wind turbines, 110kV electrical substation and ancillary development
Strategic infrastructureCase 324132Tipperary County Council
located within the townland of Graigue, Co. Tipperary. (www.killoughsid.ie)
Proposed development of a 110kV GIS substation providing connection to the national grid via a loop in/ loop out connection to the already existing Killhill - Thurles 110kV Overhead line and ancillary development
Appropriate assessmentCase 324126Wexford County Council
Application for Substitute Consent pursuant of Section 177E of the Planning and Development Act 2000 (as amended) consisting of permission to retain refurbishment works to existing cottage which include for:(i) Front porch (ii)Revised elevations (iii)First floor extensions (iv)Upgraded wastewater treatment system and (v) Ancillary site works and landscaping which will include for the upgrading of the existing vehicu…
Strategic infrastructureCase 324114Tipperary County Council
located in the townlands of Aglish and Currahaly, County Cork. (www.aglishsubstation.ie).
10 year planning permission for a 110kV AIS electricity substation, an associated loop-in/loop out grid connection into an existing 110kV overhead transmission line and all associated infrastructure
Strategic infrastructureCase 324082Cork County Council
located at Ballynanelagh, Kockraha, Co. Cork. (www.drumkeelcis.com)
The proposed development will consist of a 10-year planning permission for the construction of 1 Battery Energy Storage System, 1 110kV AIS electrical substation building and 1 single-storey customer substation building and all associated infrastructure
Strategic infrastructureCase 324069Fingal County Council
Proposed development under sections 175 and 177AE of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001-2005 (as amended) for proposed coastal and flood risk management works. A Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR) have been prepared in respect of the proposed development.
Strategic infrastructureCase 324055Kildare County Council
located across various townlands in County Kildare, Offaly and Laois. (www.derrynadarraghplanning.ie).
10 year permission for Derrynadarragh wind farm comprising of 9 no. wind turbines, onsite 110kV substation, turbine delivery route and a grid connection route
Strategic housing (historical)Case 324047Dublin City Council
Located in Rathpatrick (townland), County Kilkenny.
Proposed 110kV Gas Insulated Switchgear (GIS) electricity substation, associated grid connection and all ancillary site works. (www.drumdowneysubstation.ie)
Substitute consentCase 324015Carlow County Council
Application under Section 37L of the Planning and Development Acts, 2000-2021 for Further development consisting of further quarry extraction over an area of c. 16.17 ha to include the pre-existing quarry extraction area and additional agricultural lands in the western and south western portion of the site. The projected lifespan of the quarry is c. 20 years. The proposed development will involve blasting, extractio…
Substitute consentCase 324014Carlow County Council
Application under Section 177E of the Planning and development Acts 200-2021 for Substitute Consent consisting of quarrying including rock extraction by mechanical means and processing onsite using mobile primary crushing / screening and associated plant. The development also included soil storage areas, stockpiling areas, surface water management works and all ancillary works associated with the quarrying activitie…
Substitute consentCase 323992Galway County Council
Cregganna Beg, Oranmore, Co. Galway. I.T.M. Site Coordinates: 538760 E, 722075 N
Application for Substitute Consent pursuant of Section 177E of the Planning and Development Act 2000 (as amended) consisting the retention of importation of soil fill. A Remedial Natura Impact Statement (rNIS), an Ecological Impact Assessment (EIA) and an Environmental Impact Analysis(EIA) are being submitted with this application.
Appropriate assessmentCase 323996Kerry County Council
Public realm and community infrastructure project on lands in Ardee, Co. Louth
Case records from An Coimisiún Pleanála, with case activity up to 18 Nov 2026. Cases lodged in recent months come from the official case search and get a map location when the published case data catches up. Observer, appellant and submitter details are not shown. How we collect this.