Commencement notice group

Building extension commencement notices — Kilcullen

Kilcullen, Kildare

1 unique commencement event · latest notified commencement 26 Aug 2026 · planning reference supplied

Unique commencement events
1
Latest notified commencement
26 Aug 2026
Latest notice
45,671 m²
Planning references supplied
22/993
Public location
Kilcullen, Kildare

Verified project chain

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Completion certificates are shown only after the official planning, commencement, certificate and PDF evidence chain passes; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Kilcullen, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 22/993. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0146860KE BCMS open-data feed

The development consists of the phased demolition of existing school buildings, with the exception of the former convent and nearby stone building which are to be retained and refurbished, and the construction of a new two and three-storey school extension of approximately 10,375m² incorporating 37 general classrooms, support and specialist classrooms, a Special Educational Needs unit, a library, multimedia rooms, a single-storey multi-use sports hall, staff rooms, including photovoltaic panels. The development also includes the erection of temporary school accommodation units to allow the school to remain operational during construction, material alterations to retained buildings, a new ESB substation, and associated site works including car and bicycle parking, hard and soft landscaping, the retention of existing sports pitches and trees, drainage infrastructure, and all other ancillary site development works at Cross and Passion College, Main Street, Kilcullen, Co. Kildare, .

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 45,671 m².

Planning reference 22/993

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.