Site start
Building extension site start — Dublin
Dublin 6, Dublin
1 commencement notice · start date 22 Jun 2026 · planning reference given
Planning WEB5373/25 · Planning application
- Commencement notices
- 1
- Latest start date
- 22 Jun 2026
- Latest notice
- 819 m²
- Planning reference
- WEB5373/25
- Location
- Dublin 6, Dublin
Location
Where the site is
- Area
- Dublin 6, Dublin
- County
- Dublin
Addresses on the notices
- Lower Ground Floor level to enclose the external l
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist/consists of: (i) Cleaning and local repointing repairs of existing brickwork where required to the front façade and the brick chimney stacks; (ii) Upgrade of the existing uPVC rainwater goods to the rear and side elevations to heritage grade, cast iron goods and refurbishment of the existing cast iron rainwater downpipes and gutters; (iii) Cleaning and repointing of the central granite front entrance steps; (iv) Removal of single storey lean-to extension to the eastern gable (6 sq.M); (v) Removal of the existing single storey, western and rear extensions (88 sq.M); (vi) Provision of a new granite faced wall and open air courtyard on the western side of the main house; (vii) Provision of a new door and window at Lower Ground Floor level to enclose the external lobby space located beneath the front entrance steps; (viii) Internal alterations to the front reception room at Lower Ground Floor Level to provide a bedroom with an en-suite bathroom (ix) Replacement of the existing front wall and gates to the existing eastern courtyard with a new granite wall and new painted hardwood gates; (x) Internal and external modifications to the existing Coach House including raising the level of external walls and pitched roof by 500mm, adjusting level of the first floor, provision of new rooflights to the raised roof, modifications to existing glazing and external door opes and provision of new glazing and door opes to the front and rear facades; (xi) Construction of a set back, glazed, 2-storey extension (15 sq.M) at lower and upper ground floor levels to the eastern gable elevation to connect the main house with the existing Coach House; (xii) Provision of new internal connections to the modified eastern coach house building through the existing eastern gable external wall at Lower and Upper Ground Floor Levels; (xiii) Construction of a wraparound single storey extension to the rear with a wing of new accommodation extending on both the eastern and we
Floor area stated for this source: 819 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.