Site start

Site start — Saggart

Saggart, Dublin

3 commencement notices · latest start date 18 Sep 2024 · planning reference given

Planning SD19A/0393 · Planning application · Council file · external

View full project timeline

Commencement notices
3
Latest start date
18 Sep 2024
Latest notice
11,247 m²
Planning reference
SD19A/0393
Location
Saggart, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
1

Exact appeal 308569 · Appeal withdrawn S.140(1)(a) · 2021-03-01 · Open official case

  1. Completion certificate recorded — source scope not stated South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-09 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Saggart, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD19A/0393. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Demolition of an existing building, comprised of 3 blocks, in 3 phases. Construction of a new Post-Primary School, Coláiste Pobail Fóla on an educational campus in Citywest. This is a part 3 storey building with attic tank room, of 11246m2 delivered in 3 phases. The building is comprised of a 1000 pupil Post-Primary School with 4no. Classbase SEN; a Multi-Use Hall; ancillary teaching, pupil and staff facilities, an external store and a rooftop PV array. The building is accessed by 6no. Stairs, 6no. of which Fire Escape and 1no. Lift. Vehicular and Fire Tender access is from an existing enlarged entrance to the northwest of the site, and a new entrance from the north of the site, both off Fortunestown Lane. Cycle and Pedestrian access is from the north of the site off Fortunestown Lane, with additional pedestrian access to the south of the site off Saggart Lakes Road. Site works included the provision of bicycle and scooter parking; vehicle drop off/set down areas; internal access roads and paths; hard and soft play areas; piped infrastructure and ducting; planting, landscaping and boundary treatments; car parking spaces; bin stores; heat pumps; ancillary ramps and stairs; signage; a below ground attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 11,247 m².

Planning reference SD19A/0393
Notice 2 Seven-day notice

Construction of a new ESB Double MV substation with client switch room. This is a single storey building of 36m2 delivered in 1 phase. The building is comprised of a ESB double MV substation room and a client switch room. The building forms part of the north boundary wall and is accessed externally from a path within the site.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 36 m².

Planning reference SD19A/0393
Notice 3 Seven-day notice

Construction of a new Primary School, Gaelsoil Lir, on an educational campus in Citywest. This is a part 2 storey building with attic tank room, of 3247m2 delivered in 1 phase. The building is comprised of 16 No. Classrooms with a 2 No. Classbase SEN Unit; a General Purpose Hall; ancillary teaching, pupil and staff facilities and a rooftop PV array. The building is accessed by 4no. Stairs, 3no. of which Fire Escape and 1no. Lift. Vehicular and Fire Tender access is from an existing enlarged entrance to the northwest of the site, and a new entrance from the north of the site, both off Fortunestown Lane. Cycle and Pedestrian access is from the north of the site off Fortunestown Lane, with additional pedestrian access to the south of the site off Saggart Lakes Road. Site works included the provision of bicycle and scooter parking; vehicle drop off/set down areas; internal access roads and paths; hard and soft play areas; piped infrastructure and ducting; planting, landscaping and boundary treatments; car parking spaces; bin stores; heat pumps; ancillary ramps and stairs; signage; a below ground attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,248 m².

Planning reference SD19A/0393

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.