Commencement notice group
Commencement notices — Dublin
Dublin 5, Dublin
1 unique commencement event · latest notified commencement 08 Sep 2025 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 08 Sep 2025
- Latest notice
- 243 m²
- Planning references supplied
- None stated
- Public location
- Dublin 5, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 5, Dublin
- County
- Dublin
Notice location variants
- roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations CN0132847DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
These works are part of Planning Ref WEB2248/24 but are not part of works which require a FSC. The works are Repointing of stone work using lime pointing where required; removal of existing aluminium gutters and replacement with new cast iron gutters; at roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations; and removal of a number of slates to the main roof to allow for inspection and replacement of wall plate and rafter ends where necessary; repair and maintenance of East Gable Cross and base stone; repair and maintenance west gable cross and base stone; repair and maintenance of Bell Tower including insertion and grouting in of stainless-steel dowels; construction of 2 No. Low-level Metal Standing-seam Dormer Roofs to detail to the South Elevation Roof Eaves
Floor area stated for this source: 243 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.