Protected structure, Saint Assam's Community Hall, Saint Assam's Church, Howth...
PROTECTED STRUCTURE The development will consist of: The renovation, refurbishment and extension of the existing Protected Structure to provide for an upgraded Sports Club facility. Proposed works to the existing Protected Structure are inclusive of: (1) demolition of the existing non-original 20th century single-storey toilet...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 25 Mar 2025. / Confidence: LowDecision date 25 Mar 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE The development will consist of: The renovation, refurbishment and extension of the existing Protected Structure to provide for an upgraded Sports Club facility. Proposed works to the existing Protected Structure are inclusive of: (1) demolition of the existing non-original 20th century single-storey toilet block extension to the south of the main building; (2) removal of existing internal staircase from ground to first floor levels including false ceiling over, and infilling of the stair void...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB2248/24
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE The development will consist of: The renovation, refurbishment and extension of the existing Protected Structure to provide for an upgraded Sports Club facility. Proposed works to the existing Protected Structure are inclusive of: (1) demolition of the existing non-original 20th century single-storey toilet block extension to the south of the main building; (2) removal of existing internal staircase from ground to first floor levels including false ceiling over, and infilling of the stair void with a new timber floor to match existing; (3) removal of non-original stud partition walls at ground and first floor levels and removal of existing internal door openings at ground and first floor levels; (4) removal of existing fire escape stair at the southwestern corner of the building and the provision of a new fire escape stair in its place; (5) internal reconfiguration at ground and first floor levels of the existing building, including the addition of new stud partition walls and internal door openings to accommodate a Gym, a Club Social Hub, and a Club Office all at ground floor level; and a Sports Hall and Club Meeting Room at first floor level. Internal works at first floor level are also inclusive of: (6) remedial works to existing timber floor where required; remodelling of timber floor projecting into window bays along the north elevation, cutting back the floor to form a void and installation of aluminium fire-rated glazing; and remodelling of existing non-original fire escape door to the south elevation. External works to the existing Protected Structure include: (7) removal of modern brickwork to allow for a new window in the existing oculus opening over the arch on the western elevation; (8) remodelling of 3 no. existing window openings to the southern elevation at ground floor level to form 2 no. arched door openings and 1 no. arched window opening; (9) remodelling of 3 no. existing window openings to the southern elevation at first floor level, with one opening to be removed and 2 no. arched door openings being created; (10) repointing of stone work using lime pointing where required; (11) removal of existing aluminium gutters and replacement with new cast aluminium gutters; (12) at roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations; and removal of a number of slates to the main roof to allow for inspection and replacement of wall plate and rafter ends where necessary. The proposed development will also provide for: (13) the construction of a 2-storey flat roofed extension to the south of the existing Protected Structure, with an enclosed plant area at roof level. Internally the extension will comprise an entrance lobby, commercial unit, storage space and bathroom facilities (including an accessible W.C), all at ground floor level. Access to the first-floor level is available via a new internal platform lift and stairs, with the first floor level comprising wellness/treatment rooms for club use, shower facilities, a plant room and circulation space; (14) the proposed extension will be connected to the Protected Structure via 3 no. inter-connecting doorways at ground floor level and 2 no. inter-connecting doorways at first floor level. These linkages will comprise frameless structural glazing with internal glass fins; (15) the main pedestrian access to the premises is proposed off Main Street to the east via the existing double gates, a new stair access and platform lift are proposed inside this access. A bicycle parking entrance and fire escape are available along the north-western site boundary, and a secondary entrance and fire escape to the Protected Structure is available along the northern site boundary. The following works are also proposed: (16) provision of outdoor seating; (17) provision 16 no. bicycle parking spaces to the north of the Protected Structure in the form of Sheffield stands; (18) provision of new club signage on the eastern elevation of the proposed extension; and, (19) associated site and infrastructural works which include; foul and surface water drainage, hard and soft landscaping, boundary treatments, provision of solar PV panels at roof level, internal mechanical and electrical works, lighting, bin storage and all associated site works necessary to facilitate the development. The subject property, Saint Assam's Community Hall, Saint Assam's Church, is a Protected Structure.
Application to site progress
-
Applied 4 Oct 2024 WEB2248/24
-
Decision Grant Permission 25 Mar 2025
-
Appeal Contribution Appeal Decided 322339 / 5 Aug 2025
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2248/24
PROTECTED STRUCTURE The development will consist of: The renovation, refurbishment and extension of the existing Protected Structure to provide for an upgraded Sports Club facility. Proposed works to the existing Protected Structure are inclusive of: (1) demolition of the existing non-original 20th century single-storey toilet block extension to the south of the main building; (2) removal of existing internal staircase from ground to first floor levels including false ceiling over, and infilling of the stair void with a new timber floor to match existing; (3) removal of non-original stud partition walls at ground and first floor levels and removal of existing internal door openings at ground and first floor levels; (4) removal of existing fire escape stair at the southwestern corner of the building and the provision of a new fire escape stair in its place; (5) internal reconfiguration at ground and first floor levels of the existing building, including the addition of new stud partition walls and internal door openings to accommodate a Gym, a Club Social Hub, and a Club Office all at ground floor level; and a Sports Hall and Club Meeting Room at first floor level. Internal works at first floor level are also inclusive of: (6) remedial works to existing timber floor where required; remodelling of timber floor projecting into window bays along the north elevation, cutting back the floor to form a void and installation of aluminium fire-rated glazing; and remodelling of existing non-original fire escape door to the south elevation. External works to the existing Protected Structure include: (7) removal of modern brickwork to allow for a new window in the existing oculus opening over the arch on the western elevation; (8) remodelling of 3 no. existing window openings to the southern elevation at ground floor level to form 2 no. arched door openings and 1 no. arched window opening; (9) remodelling of 3 no. existing window openings to the southern elevation at first floor level, with one opening to be removed and 2 no. arched door openings being created; (10) repointing of stone work using lime pointing where required; (11) removal of existing aluminium gutters and replacement with new cast aluminium gutters; (12) at roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations; and removal of a number of slates to the main roof to allow for inspection and replacement of wall plate and rafter ends where necessary. The proposed development will also provide for: (13) the construction of a 2-storey flat roofed extension to the south of the existing Protected Structure, with an enclosed plant area at roof level. Internally the extension will comprise an entrance lobby, commercial unit, storage space and bathroom facilities (including an accessible W.C), all at ground floor level. Access to the first-floor level is available via a new internal platform lift and stairs, with the first floor level comprising wellness/treatment rooms for club use, shower facilities, a plant room and circulation space; (14) the proposed extension will be connected to the Protected Structure via 3 no. inter-connecting doorways at ground floor level and 2 no. inter-connecting doorways at first floor level. These linkages will comprise frameless structural glazing with internal glass fins; (15) the main pedestrian access to the premises is proposed off Main Street to the east via the existing double gates, a new stair access and platform lift are proposed inside this access. A bicycle parking entrance and fire escape are available along the north-western site boundary, and a secondary entrance and fire escape to the Protected Structure is available along the northern site boundary. The following works are also proposed: (16) provision of outdoor seating; (17) provision 16 no. bicycle parking spaces to the north of the Protected Structure in the form of Sheffield stands; (18) provision of new club signage on the eastern elevation of the proposed extension; and, (19) associated site and infrastructural works which include; foul and surface water drainage, hard and soft landscaping, boundary treatments, provision of solar PV panels at roof level, internal mechanical and electrical works, lighting, bin storage and all associated site works necessary to facilitate the development. The subject property, Saint Assam's Community Hall, Saint Assam's Church, is a Protected Structure.
Open official record