Commencement notice group
Commencement notices — Mogeely
Mogeely, Cork
4 unique commencement events · latest notified commencement 08 May 2019 · planning reference supplied
- Unique commencement events
- 4
- Latest notified commencement
- 08 May 2019
- Latest notice
- 240 m²
- Planning references supplied
- 16/7031
- Public location
- Mogeely, Cork
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Mogeely, Cork
- County
- Cork
Notice location variants
- Dairygold Wastewater Treatment Plant (WwTP) CN0047758CC
- Notice source points are up to 462 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0051206CC · 51.927966, -8.058309 Open point
- CN0049267CC · 51.929208, -8.058845 Open point
- CN0048637CC · 51.927525, -8.058250 Open point
- CN0047758CC · 51.925062, -8.058348 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Building 25 - Pasteurisation & RO Building
Floor area stated for this source: 240 m².
Construction of the following buildings; Building 21 - Milk Intake Building Building 26 - Weighbridge Building
Floor area stated for this source: 821 m².
Construction of the following buildings; Building 27 – Firewater Pumphouse/Water Treatment/Electrical Building Building 28 – ESB Sub-Station & Switchrooms Building
Floor area stated for this source: 159 m².
New Dewatering & Control building at Dairygold Wastewater Treatment Plant (WwTP)
Floor area stated for this source: 72 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.