Site start

Site start — Mogeely

Mogeely, Cork

4 commencement notices · latest start date 08 May 2019 · planning reference given

Planning 16/7031 · Planning application

View full project timeline

Commencement notices
4
Latest start date
08 May 2019
Latest notice
240 m²
Planning reference
16/7031
Location
Mogeely, Cork

Location

Where the site is

Area
Mogeely, Cork
County
Cork

Addresses on the notices

  • Dairygold Wastewater Treatment Plant (WwTP)
Location evidence needs care
  • Notice source points are up to 462 m apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 51.927966, -8.058309 Open point
  • Public notice source · 51.929208, -8.058845 Open point
  • Public notice source · 51.927525, -8.058250 Open point
  • Public notice source · 51.925062, -8.058348 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Building 25 - Pasteurisation & RO Building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 240 m².

Planning reference 16/7031
Notice 2 Commencement notice (owner-supplied)

Construction of the following buildings; Building 21 - Milk Intake Building Building 26 - Weighbridge Building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 821 m².

Planning reference 16/7031
Notice 3 Commencement notice

Construction of the following buildings; Building 27 – Firewater Pumphouse/Water Treatment/Electrical Building Building 28 – ESB Sub-Station & Switchrooms Building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 159 m².

Planning reference 16/7031
Notice 4 Commencement notice (owner-supplied)

New Dewatering & Control building at Dairygold Wastewater Treatment Plant (WwTP)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 72 m².

Planning reference 16/7031

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.