Infrastructure · Co. Cork

Mogeely and Killamucky Mogeely Co. Cork

Granted on appeal 24 Apr 2018 (Decision to grant 4 Aug 2017 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Co. Cork by email

Key facts

  • Planning application 16/7031 at Mogeely and Killamucky Mogeely Co. Cork: New cheese production facility and a significant upgrade…
  • It was received by Cork County Council on 8 Dec 2016.
  • Status: Granted on appeal 24 Apr 2018 (Decision to grant 4 Aug 2017 by the council).
  • Work was due to start on 30 Jan 2019, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Cork County Council planning register, as last seen on 2 Jun 2026. Search the council's register

Planning applications in Co. Cork

Council register

The council's register shows: Decision to grant on 4 Aug 2017.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

New cheese production facility and a significant upgrade…

To construct new cheese production facility and a significant upgrade of the existing Dairygold Food Ingredients (DFI) facility. The proposed development consists of: 1. Construction of the following Buildings or structures and associated services and site works:- • Cheese Production Building – predominantly single-storey with 3-storey middle section and 2-storey administration block • Single storey part Open sided, roofed, Milk Intake Unit and piperack structure • Single storey Workshop • Single storey Box Store • 2-storey Reception and Staff Facilities Building • Single storey Boiler House • Single storey RO and Pasteurisation Building • Single storey Weighbridge Security Building • Single storey Water Treatment and Fire Pumphouse Building • Electrical Sub-station and Switchroom • 2-bay Loading Bay structure attached to the northern end of the existing cheese factory • 2 No. water storage tanks (12.6m and 9.6m high); 1 No. Salt Saturation Storage Tank (5.1m high) 2. Closure of 3 entrances and the construction of new entrance for HGV traffic off the L3627 on the northern site boundary. Closure of the existing HGV entrance and construction of new entrance for staff and visitor car traffic only off the L3805 Mogeely-Castlemartyr Road on the eastern site boundary 3. Demolition of the following Buildings or Structures and associated services: a) Dairy and Maintenance Workshop Building; b) Packaging Store; c) Boiler House and 3 No. stacks (33.9m high); d) Canteen; e) Reception and Office Building; f) Generator Building and removal of all associated Redundant Tankage. 4. Upgrade of an existing bund and construction of new adjoining bund to accommodate existing tanks and the following new tankage, (height listed in brackets) and all services associated with the tankage: 6 No. Milk Silos(14.0m), 2 No. Milk Silos(18.5m), 3 No. Cream Storage Tanks(5.8m), 5 No. Cleaning Tanks(8.0m), 4 No. Cleaning Tanks(5.0m), 2 No. Whey Silos(12.7m), 2 No. Whey Silos(13.2m), 2 No. Bulk Chemical Tanks(5.45m) 5. Construction of a 124 space Car Park, Internal Roads accessing the site from the new Entrances / Exits, Covered Pedestrian Walkway and mounded Berms, Boundary Walls, Fencing and all Associated Landscaping Works. 6. Upgrade and expansion of the existing Wastewater Treatment Plant including new Balance Tank, Anaerobic and Aerobic Tanks, Clarifier, Picket Fence Thickener, Dissolved Air Flotation (DAF) Plant, Pumping Station, Control Room, Filters and Concrete Plinths. The propo

Location
Co. Cork Map
Planning reference
16/7031

Numbers and dates

Project type
Infrastructure
Received
8 Dec 2016
Council decision
4 Aug 2017
Appeal lodged
24 Aug 2017
Granted on appeal
24 Apr 2018
Site start notified
30 Jan 2019

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Outlook

What happens next

Work was due to start on 30 Jan 2019, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Cork County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 30 Jan 2019Notice filed · phase 1 · New Dewatering & Control building at Dairygold Wastewater Treatment Plant (WwTP)View the site start
  2. 26 Feb 2019Notice filed · phase 2 · Construction of the following buildings; Building 27 – Firewater Pumphouse/Water...View the site start
  3. 14 Mar 2019Notice filed · phase 3 · Construction of the following buildings; Building 21 - Milk Intake Building Building 26...View the site start
  4. 8 May 2019Notice filed · phase 4 · Building 25 - Pasteurisation & RO BuildingView the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Co. Cork

Get alerts for Co. CorkFree. We email you when new applications appear.

Free email alerts

Get new Cork projects by email

New applications, decisions and site starts in Co. Cork. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options