Commencement notice group

Housing commencement notices — Ballina

Ballina, Mayo

1 unique commencement event · latest notified commencement 30 Jun 2026 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
30 Jun 2026
Latest notice
50 houses
Planning references supplied
2560008
Public location
Ballina, Mayo

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Ballina, Mayo
County
Mayo
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Mayo County Council planning record Application details, status and decision record for 2560008. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0144633MO BCMS open-data feed

Construction of a housing development with a total of 50 no. dwellings in detached, semi-detached and terrace configurations, consisting of 19 no. 5-bed detached houses, 6 no. 4-bed semi-detached houses, 2 no. 3-bed semi-detached houses, 1 no. 3-bed detached house, 10 no. 3-bed terrace houses, 11 no. 2-bed terrace houses and 1 no. 2 bed detached single storey house. Associated development and works including the extension of existing pedestrian and vehicular access to Lansyn Bohernasup, all hard and soft landscaping, internal roads and footpaths, cycle and car parking, public and private amenities and open spaces, boundary treatments, public lighting, and all other ancillary works above and below ground including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.

Work stated for this notice 50 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 6,313 m².

Planning reference 2560008

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.