Site start
Housing site start — Ballintra
Ballintra, Donegal
1 commencement notice · start date 02 Sep 2026 · planning reference given
Planning 2461649 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 02 Sep 2026
- Latest notice
- 20 units
- Planning reference
- 2461649
- Location
- Ballintra, Donegal
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2461649 Donegal County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Ballintra, Donegal
- County
- Donegal
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Donegal County Council planning record Application details, status and decision record for 2461649. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) Construction of (a) 6 no. 1 bedroom apartments located within a single / two storey building, (b) 6 no. 2 bedroom two storey dwelling houses, (c) 6 no. 3 bedroom two storey dwelling houses and (d) 2 no. 4 bedroom two storey dwelling houses, 20 no. residential units in total, (2) Construction of a new entrance, access road and car parking facilities to the proposed development including the construction of pedestrian footpath to connect to existing footpath to the south of the development site, (3) Installation of public lighting throughout the development, (4) construction of (a) foul sewer network which shall be pumped (322m) to connect into existing foul sewer and (b) storm water drainage network including attenuation tank, and installation of a watermain network to the proposed development and (5) Provision of public open space amenities and all associated site development works.
Floor area stated for this source: 6,762 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.