Commencement notice group
Housing commencement notices — Stillorgan
Stillorgan, Dublin, Dublin
1 unique commencement event · latest notified commencement 16 Jan 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 16 Jan 2023
- Latest notice
- 1 house
- Planning references supplied
- D21A/0929
- Public location
- Stillorgan, Dublin, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Stillorgan, Dublin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The conservation, alterations, extension and refurbishment of the existing detached three storey house (Protected Structure), with associated site, The alterations comprise, at ground floor:- the removal of the non-original glazed rear porch, the removal of a non- original external door and window in the kitchen and the blocking up of the openings; the replacement of non-original casement window with a sash window to match the originals, the removal of an internal wall between the existing kitchen and sitting room; the insertion of a visitors bathroom, the insertion of two no. patio doorsteps from the sitting room to the rear garden; and at first floor:- the removal in 2 no. existing bathrooms of non-original partitions, finishes and sanitary ware, the replacement of 2 no. non-original rooflights, the formation of a part dormer roof over the northern annexe, the breaking out of two no. new doorsets to a new En Suite Bathroom and dressing room extension at the southern annexxe; at second floor:- the alteration of non-original existing en suite bathroom partition and renewal of finishes and fittings. The extension comprises:- at ground floor, the addition of c. 5 sqm to the existing home office, and at first floor, the addition of c 16.5 sqm, to form new en suite bathroom and dressing room, with new sash windows front and rear to match existing windows. The works also include the renewal of non-original plumbed and wired services and kitchen, bathroom and bedroom fittings and fixtures, the conservation and repair of existing windows and doors, and the replacement in natural slate of the existing fibre cement slated roof on the rear annex.
Floor area stated for this source: 477 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.