Commencement notice group

Commencement notices — Dublin

Dublin, Dublin

1 unique commencement event · latest notified commencement 09 Sep 2026 · planning reference supplied

Unique commencement events
1
Latest notified commencement
09 Sep 2026
Latest notice
2,859 m²
Planning references supplied
F23A/0040
Public location
Dublin, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The proposed development involves the expansion of the existing ESB Belcamp 220 kV Substation to increase electricity transmission capacity and support the integration of renewable energy generation into the national grid. The works will include the construction of a new 220 kV Gas Insulated Switchgear (GIS) building and associated electrical infrastructure. The development will include lightning protection masts, underground cabling, drainage infrastructure, site access upgrades, hardstanding areas, perimeter security measures, and all associated ancillary works within an extension of the existing substation compound. Provisions will also be made for future expansion within the extended compound, including future transformers and a STATCOM system for voltage support. Access to the site will be via the existing entrance and internal access road from the R139 regional road.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,859 m².

Planning reference F23A/0040