Energy · Co. Dublin
ESB Belcamp 220 kV Substation, in the townlands of Clonshaugh and Belcamp, Co. Dublin
Granted 26 Oct 2023
We no longer update this application, so we can't email you about it. Get new planning applications in In The Townlands Of Clonshaugh And Belcamp by email
Key facts
- Planning application F23A/0040 at ESB Belcamp 220 kV Substation, In The Townlands of Clonshaugh and Belcamp, Co. Dublin: New electricity transmission infrastructure.
- It was received by Fingal County Council on 8 Feb 2023.
- Status: Granted 26 Oct 2023.
- Work started on site on 9 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Fingal County Council planning register, as last seen on 13 Oct 2026. Open the council's file
More planning applications in In The Townlands Of Clonshaugh And Belcamp · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 26 Oct 2023.
Application details as we last saw them in the national register on 13 Oct 2026.
What and where
New electricity transmission infrastructure
The development will consist of the provision of new electricity transmission infrastructure at the existing ESB Belcamp 220 kV substation, comprising: 1. Installation of an additional 220 kV Gas Insulated Switchgear (GIS) 16 Bay Building north of the existing station compound (approximately 84 m by 25m and 17 m in height), this includes an associated extension to the hardstanding compound {approximately 3.2 hectares) to facilitate the same. This includes: a) Three 220/110 kV transformers located adjacent to the new 220 kV GIS building (approximately 8m high); b) A busduct connection from the new 220 kV GIS building to the existing 220 kV Belcamp substation; c) One +100 MVAR220 kV STATCOM transformer including associated auxiliary transformer, series coils, outdoor cooling bank control and valve building; 2. Seven lightning protection masts (ranging in height from approximately 8 m to 20 m); 3. All ancillary site development works including site preparation works, site clearance and levelling; provision of hardstanding, internal access tracks and temporary construction compound; associated underground cabling and earthgrid; associated extended surface water drainage network including attenuation storage; associated reinforced concrete perimeter wall (3 m in height with a 1 m electric fence on top); perimeter palisade fencing (3 m in height), external lighting as required to facilitate the development; 4. Access to the proposed development site will be via the existing internal access road, and existing vehicular entrance onto the R139 regional road. A Natura Impact Statement (NIS) accompanies this application. AI received 01/09/23
- Location
- Co. Dublin Map
- Council
- Fingal County Council
- Planning reference
- F23A/0040
- Application type
- Permission
Numbers and dates
- Project type
- Energy
- Received
- 8 Feb 2023
- Granted
- 26 Oct 2023
- Site start
- 9 Sep 2026
Timeline
- Application received
- Granted
- Site start
Site history
This site's history
-
Application F23A/0040/C3/12 at the same address: decision: In compliance (21 Oct 2026).
Compliance with condition 12 of F23A/0040 Same address -
Application F23A/0040/C2/6 at the same address: decision: Noncompliance (15 Oct 2026).
Compliance with condition 6 of F23A/0040 Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file F23A/0040 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Fingal County Council planning register, as last seen on 13 Oct 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 9 Sep 2026Work started · The proposed development involves the expansion of the existing ESB Belcamp 220 kV...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.