Energy, Kellistown East, Co. Carlow
a 10-year permission for the development. The development will consist of the construction of BESS, tail-fed 220kV step-up transformer and all associated ancillary development on ca.6.5 hectare (‘ha’) site consisting of: (i) 210 BESS units each containing six power conversion system units; (ii) 30 static smart transformer...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 12 Nov 2026; no procurement timetable is published.
Decision due 12 Nov 2026 / Confidence: MediumPublic planning decision due date; the authority may update it.
Open evidenceNo commencement indexed / A scheme cannot commence under this application before permission.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
a 10-year permission for the development. The development will consist of the construction of BESS, tail-fed 220kV step-up transformer and all associated ancillary development on ca.6.5 hectare (‘ha’) site consisting of: (i) 210 BESS units each containing six power conversion system units; (ii) 30 static smart transformer stations units; (iii) 60 distribution transformers units; (iv) one auxiliary services building; (v) one office building; (vi) one control building; (vii) one storage building; (viii) one...
Open scope evidenceNamed firms
Public source roles
- Klt Bess Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Carlow County Council
- Exact reference
- 2660287
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Klt Bess Ltd
- Planning agent
- Anna D'Arcy
- Agent address
- Ground Floor, Unit 3 Bracken Business Park, Bracken Road Sandyford, Dublin 18 D18 V32Y
More Carlow planning activity
These are county discovery links, not claimed relationships to this application.
Application text
a 10-year permission for the development. The development will consist of the construction of BESS, tail-fed 220kV step-up transformer and all associated ancillary development on ca.6.5 hectare (‘ha’) site consisting of: (i) 210 BESS units each containing six power conversion system units; (ii) 30 static smart transformer stations units; (iii) 60 distribution transformers units; (iv) one auxiliary services building; (v) one office building; (vi) one control building; (vii) one storage building; (viii) one tail-fed 220 kV step-up transformer; (ix) one auxiliary transformer; (x) one Independent Power Producer (‘IPP’) building with two switchgear rooms and auxiliary systems; (xi) one underground firewater retention holding tank (ca.350m³ capacity); (xii) one firewater tank (ca.250m³ capacity); (xiii) one infiltration basin (ca.1,689m³ capacity); (xiv) upgrade works to the existing Site entrance; (xv) internal access tracks between the BESS units, IPP Building and Site entrance; (xvi) underground electrical and communications cabling within private lands; (xvii) one temporary construction compound; (xviii) landscaped berms of up to ca.3m in height; (xix) perimeter security fencing of up to 2.4m in height and security gates; (xx) pole-mounted security cameras; and (xxi) all associated ancillary site development, landscaping and reinstatement works. A 40-year operational life from the date of full commissioning of the entire BESS project is being sought for the proposed development (other than temporary works specified above), and the subsequent decommissioning. A Natura Impact Statement will accompany the planning application
Application to site progress
-
Applied 18 Sep 2026 2660287
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660287
a 10-year permission for the development. The development will consist of the construction of BESS, tail-fed 220kV step-up transformer and all associated ancillary development on ca.6.5 hectare (‘ha’) site consisting of: (i) 210 BESS units each containing six power conversion system units; (ii) 30 static smart transformer stations units; (iii) 60 distribution transformers units; (iv) one auxiliary services building; (v) one office building; (vi) one control building; (vii) one storage building; (viii) one tail-fed 220 kV step-up transformer; (ix) one auxiliary transformer; (x) one Independent Power Producer (‘IPP’) building with two switchgear rooms and auxiliary systems; (xi) one underground firewater retention holding tank (ca.350m³ capacity); (xii) one firewater tank (ca.250m³ capacity); (xiii) one infiltration basin (ca.1,689m³ capacity); (xiv) upgrade works to the existing Site entrance; (xv) internal access tracks between the BESS units, IPP Building and Site entrance; (xvi) underground electrical and communications cabling within private lands; (xvii) one temporary construction compound; (xviii) landscaped berms of up to ca.3m in height; (xix) perimeter security fencing of up to 2.4m in height and security gates; (xx) pole-mounted security cameras; and (xxi) all associated ancillary site development, landscaping and reinstatement works. A 40-year operational life from the date of full commissioning of the entire BESS project is being sought for the proposed development (other than temporary works specified above), and the subsequent decommissioning. A Natura Impact Statement will accompany the planning application
Open official record