Infrastructure · Co. Cork

Island Mills (Protected Structure) Mill Road Fermoy Co. Cork

Granted on appeal 17 Apr 2019 (Decision to grant 20 Nov 2018 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Co. Cork by email

Key facts

  • Planning application 18/4750 at Island Mills (Protected Structure) Mill Road Fermoy Co. Cork: Change of Use of existing buildings.
  • It was received by Cork County Council on 29 Mar 2018.
  • Status: Granted on appeal 17 Apr 2019 (Decision to grant 20 Nov 2018 by the council).
  • Work was due to start on 5 Nov 2020, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Cork County Council planning register, as last seen on 2 Jun 2026. Search the council's register

Planning applications in Co. Cork

Council register

The council's register shows: Decision to grant on 20 Nov 2018.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Change of Use of existing buildings

Change of Use of existing buildings on site (older Mill building, which is a Protected Structure and newer office building known as Block A) from a previous office use to use as a Primary Healthcare Centre for the Health Service Executive (HSE) and general medical doctors. The work requires demolition of an existing single storey link, staff catering building adjoining the Mill and sections of Block A (220m²). The development will also include a two storey extension to Block A of (395m²) to a total of (2408m²), a new double height entrance lobby with coffee shop, 5 storey lift serving the Mill and external steps together with a new two storey building of (408m²), sq. m which will be used as a dispensary and medical aid area. Block A will also be altered by the removal of central floor area in the middle of the building to create a light well for improved ventilation and light. (Area included in above demolition calculation). The Mill building, which is a Protected Structure, will be refurbished. Work to the building will include replacement windows, construction of a new slate roof and new service installation. A Natura Impact Statement will be submitted to the planning authority with the application. The total existing floor area of the buildings on site is 3,223 sq. m. Following these changes it will be 4,112 sq. m. The existing surface car park containing space for 274 cars will be resurfaced and laid out with parking spaces for 217 cars. The existing ESB substation will be retained. New building signage and new site signage will be installed. The existing vehicle access will adjusted to allow for both pedestrian and cycle access and a new Mill Road boundary treatment and landscaping will remain as at present.

Location
Co. Cork Map
Planning reference
18/4750

Numbers and dates

Floor area
3,223 m²
Project type
Infrastructure
Received
29 Mar 2018
Council decision
20 Nov 2018
Appeal lodged
14 Dec 2018
Granted on appeal
17 Apr 2019
Site start notified
5 Nov 2020
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Outlook

What happens next

Work was due to start on 5 Nov 2020, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Cork County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 5 Nov 2020Notice filed · Change of use of existing Mill Building (Protected Structure) to GP Clinic and previous...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Co. Cork

Get alerts for Co. CorkFree. We email you when new applications appear.

Free email alerts

Get new Cork projects by email

New applications, decisions and site starts in Co. Cork. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options