Telecoms · Co. Cork

Kilboultragh, Macroom, Co. Cork

Decision due 8 Dec 2026

Get updates on this application

We'll email you when the council decides, if the decision is appealed, and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 26/2649 at Kilboultragh, Macroom, Co. Cork: Permissin for.
  • The applicant is Nephin Renewable Gas - MacRoom Ltd. The agent is Luke Wymer.
  • It was received by Cork County Council on 14 Oct 2026.
  • Status: Decision due 8 Dec 2026.
  • The council's decision is due on 8 Dec 2026. Building work can only follow a grant of permission.

Source: the Cork County Council planning register, checked 17 Oct 2026. Open the council's file

More planning applications in Macroom · Planning applications in Co. Cork

What and where

Permissin for

Permissin for: • Demolition of 13 no. existing disused intensive agricultural structures (former piggery) comprising sheds, silos, and tanks (with a combined gross floor area (GFA) of c. 2,256.3 sq.m), located within the northeastern section of the site and site clearance works. • Construction of 3 no. digesters (c. 15.5m in height), 1 no. digestate storage tank (c. 15.5m in height), located in the northeastern portion of the main site area. • 2 no. liquid feed tanks (c. 7.2m in height), a pump house (with a GFA of c. 14 sq.m and a height of c. 2.6m), and a pump skid (c. 0.8m in height) located adjacent to the digesters. • 3 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 6m in height) a pre fertiliser manufacturing tank (c. 6m in height), ferric chloride storage tank (c. 6m in height), and rain water storage tank (c. 6m in height), located to the west of the digesters, in the central portion of the site. • An O2 generation unit (with a GFA of c. 13.9 sq.m and a height of c. 2.6m), an O2 container (with a GFA of c. 13.9 sq.m and a height of c. 2.6m), an electrical container (with a GFA of c. 13.9 sq.m and a height of c. 2.6m), and a pump container (with a GFA of c. 16.9 sq.m and a height of c. 2.6m), located within the eastern section of the main site area, between the digesters. • A part single-storey and part two-storey reception hall (with a GFA of c. 1,964.4 sq.m and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, storage areas, and a liquid feed intake area, with an adjacent fire water storage tank (c. 7.7m in height) and well with water treatment equipment, located north of the reception hall, all located in the north-central portion of the site, to the west and northwest of the digesters. • A single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and an overall height of c. 12.4m, a fuel tank (c. 1.6m in height), a backup generator (c. 2.3m in height), located to the south of the reception hall, in the central portion of the site. • Odour abatement plant (c. 12m in height to stack) and equipment and a digestate offtake area to the south of the solid digestate storage and nutrient recovery building. • 2 no. biogas treatment skids (c. 4.1m in height), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 10m to top of flue), 2 no. biogas compression systems (c. 2.6m in height), a gas boiler (with a GFA of c. 13.1 sq.m and a height of c. 5.6m to top of flue), and a biogas upgrading module (with a GFA of c. 27.8 sq.m and a height of c. 4.6m), located in the southern portion of the main site area. • An emergency dual fuel flare (c. 11.3m in height) and 2 no. propane tanks (c. 1.3m in height), located to the west of the biogas treatment structures, within the southern portion of the main site area. • An ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m, a grid injection unit (with a GFA of c. 21.7 sq.m and a height of c. 2.8m), which will be connected to the gas grid via an underground connection by Gas Networks Ireland, within a fenced compound, and a grid offtake skid, located in the western portion of the main site area. • Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.7m and a GFA of c. 305.2 sq.m) located within the northwestern portion of the main site area. • Alterations to the L7451, the L7451 / Masseytown Road / L3417 junction, and the L3417, to the southwest of the main site area, to allow for improved access and safety, including the provision of a new site entrance, road widening, boundary setback, the trimming of overhanging tree branches and vegetation, and signage. • Construction of a site access road from the L7451 leading to the main site area, including a new entrance gate. • Provision of a discharge pipe route extending from the main anaerobic digestion facility southwest along the proposed site access road, south along L7451, and west adjacent to the L3417. • Associated works including parking (8 no. spaces, including 3 no. EV and 1 no. accessible parking spaces), and bike storage (10 no. spaces), solar PV arrays at roof level, wastewater treatment equipment, bunding and surface treatments, an attenuation pond and surface drainage features, internal roads, a weighbridge, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping (including screening planting to along the local road to the east / southeast of the main site area), acoustic barriers, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Location
Macroom, Co. Cork Map
Planning reference
26/2649
Application type
Permission
Applicant
Nephin Renewable Gas - MacRoom Ltd
Agent
Luke Wymer
Council planning fileGet alerts

Numbers and dates

Floor area
2,256 m²
Project type
Telecoms
Received
14 Oct 2026
Decision due
8 Dec 2026

Outlook

What happens next

The council's decision is due on 8 Dec 2026. Building work can only follow a grant of permission.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 26/2649 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Cork County Council planning register, checked 17 Oct 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Macroom

Get alerts for MacroomFree. We email you when new applications appear.

Free email alerts

Get new Macroom projects by email

New applications, decisions and site starts in Macroom, Co. Cork. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options