Infrastructure · Co. Cork
Ballythomas East, Ballythomas West Horse Hill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
Granted 4 Oct 2019 (final grant issued 11 Nov 2019)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Cork by email
Key facts
- Planning application 19/6029 at Ballythomas East, Ballythomas West Horse Hill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork: Pharmaceutical manufacturing building extension.
- It was received by Cork County Council on 13 Aug 2019.
- Status: Granted 4 Oct 2019 (final grant issued 11 Nov 2019).
Source: the Cork County Council planning register, as last seen on 2 Jun 2026. Search the council's register
Council register
The council's register shows: Granted on 4 Oct 2019.
Search the Cork planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Pharmaceutical manufacturing building extension
A 10 year Permission for development of a pharmaceutical manufacturing building extension, IE2b, located within the existing manufacturing facility consisting of: A pharmaceutical manufacturing building extension to the existing IE2 pharmaceutical manufacturing building, including production and plant accommodation over 3 floors and intermediate mezzanine floors and platforms, and a ground to parapet height of 27.5 metres with roof mounted equipment and associated external plant and equipment and local roof mounted vents. All located to the south of the existing IE2 Building. Modifications to the existing IE2 Building including the demolition of the existing single storey entrance lobby to accommodate the proposed extension. A single storey electrical building 7 metres high. Demolition of the existing forklift parking shelter located on the eastern side of building IE1. The installation of 3 dedicated manufacturing material supply vessels located inside the existing bunded tank farm located to the east of the IE2 Building. The installation of 2 additional bunded waste vessels adjacent to the existing bunded tank farm south of the IE4 Building and bunded aqueous waste vessel North of the IE8 Building. 60 number permanent parking spaces. The proposed works include revisions to underground services, modifications and extensions to existing pipe bridges and ground works, site lighting and ancillary items and modifications to roadworks and yard areas and modifications to existing surface water drainage system including surface water attenuation. This application relates to development which consists of an activity for which an Industrial Emissions licence under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required. The site currently operates under an Industrial Emissions (IE) Licence No. P0009-04 which will be reviewed for the purposes of the proposed development. The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazzards involving Dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the Application.
- Location
- Dunderrow Kinsale, Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 19/6029
Numbers and dates
- Project type
- Infrastructure
- Received
- 13 Aug 2019
- Decision to grant
- 4 Oct 2019
- Final grant
- 11 Nov 2019
- Site start notified
- 21 Nov 2019
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 19/6029.Search the register
How we know this
From the Cork County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 21 Nov 2019Notice filed · IE2b Expansion Project at ELi Lilly - A Pharmaceutical Manufacturing Building Extension...View the site start
- Partial completion certificate recordedRecorded in Nov 2019 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.