Energy · Co. Cork

Minor modifications and reconfigurations to the previously permitted…, Ballincarroonig, Co. Cork

Granted 14 Dec 2021 (final grant issued 27 Jan 2022)

We no longer update this application, so we can't email you about it. Get new planning applications in Co. Cork by email

Key facts

  • Planning application 21/6856 at Ballincarroonig, Co. Cork: Minor modifications and reconfigurations to the previously permitted…
  • It was received by Cork County Council on 20 Oct 2021.
  • Status: Granted 14 Dec 2021 (final grant issued 27 Jan 2022).
  • Work was due to start on 22 Dec 2022, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Cork County Council planning register, as last seen on 2 Jun 2026. Search the council's register

Planning applications in Co. Cork

Council register

The council's register shows: Granted on 14 Dec 2021.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Minor modifications and reconfigurations to the previously permitted…

Minor modifications and reconfigurations to the previously permitted Battery Energy Storage System (BESS) development (Cork County Council Reg Ref. 19/04891), primarily comprising: (1) Updated layout of the substation compound based on revised electrical requirements to facilitate grid connection; (2) revised battery equipment based on updated battery technology; and (3) ancillary equipment to support the BESS development. The amended design incorporates: a 159 MW capacity BESS facility located within a secured compound, on a c. 3.3 Ha site, and will include: (a) 36 No. battery container unit arrangements on concrete plinths (95 sq.m.; height of 3m); (b) 36 No. inverter / transformer / RMU unit arrangements on concrete plinths (50 sq.m.; height of 4.2m); (c) a substation compound surrounded by a 2.6 m high palisade fence with a dedicated access gate containing: 2 No. control building (c. 240 sq.m. 5.1m high) and electrical plant including: 2 No. bunded house transformers (c. 200 sq.m. surrounded by 8m high fire wall); 2 No. bunded house transformers (c. 19.8 sq.m. surrounded by 3 m high fire wall) and 2 No. VAR support units on concrete plinths (24 sq.m., 3.4 m high); (d) a 2.6 m high palisade fence and access gate, with primary access via the existing station and internal roadway network and temporary access via the existing boundary onto the R630; (e) ancillary plant equipment and structures including lightning masts (c. 18 m high) and pole mounted CCTV cameras (c. 8.3 m high) and ancillary site works including site clearance works and the installation of site services including underground cables. The planning permission is being sought for a 10 year duration. Licensed by the Environmental Protection Agency under an Industrial Emissions (IE) License [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015.

Location
Ballincarroonig, Co. Cork Map
Planning reference
21/6856

Numbers and dates

Project type
Energy
Received
20 Oct 2021
Decision to grant
14 Dec 2021
Final grant
27 Jan 2022
Site start notified
22 Dec 2022

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work was due to start on 22 Dec 2022, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 21/6856.Search the register

How we know this

From the Cork County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 22 Dec 2022Notice filed · IPP substation comprising a single-storey building and external plinths.View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Ballincarroonig

Get alerts for Co. CorkFree. We email you when new applications appear.

Free email alerts

Get new Cork projects by email

New applications, decisions and site starts in Co. Cork. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options