Telecoms · Co. Cork
In the townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork, Co. Cork
Decision due 10 Dec 2026
Key facts
- Planning application 26/2675 at In The Townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork, Co. Cork: Following elements.
- The applicant is Derryroe Stability Ltd. The agent is Caitriona Fox.
- It was received by Cork County Council on 16 Oct 2026.
- Status: Decision due 10 Dec 2026.
- The council's decision is due on 10 Dec 2026. Building work can only follow a grant of permission.
Source: the Cork County Council planning register, checked 17 Oct 2026. Open the council's file
More planning applications in Coachford · Planning applications in Co. Cork
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Following elements
The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a. Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b. High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing and associated sightline improvement works, including the setback, lowering and trimming of existing boundaries and vegetation as required; and vi. all associated drainage and ancillary works necessary to facilitate the development. A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
- Location
- Coachford, Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 26/2675
- Application type
- Permission
- Applicant
- Derryroe Stability Ltd
- Agent
- Caitriona Fox
Numbers and dates
- Project type
- Telecoms
- Received
- 16 Oct 2026
- Decision due
- 10 Dec 2026
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 26/2675 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Cork County Council planning register, checked 17 Oct 2026. We link to the council's own file so you can check the official record before you act.
Explore the area