Nos. 31 32 and 33, South Terrace, Cork
Granted 21 Dec 2022 (final grant issued 10 Feb 2023)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Cork by email
Key facts
- Planning application 2240897 at Nos. 31 32 and 33, South Terrace, Cork: Redevelopment, conservation.
- It was received by Cork City Council on 25 Feb 2022.
- Status: Granted 21 Dec 2022 (final grant issued 10 Feb 2023).
- Work was due to start on 26 Nov 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Cork City Council planning register, as last seen on 2 Jun 2026. Open the council's file
Council register
The council's register shows: Granted on 21 Dec 2022.
Search the Cork City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Redevelopment, conservation
Permission for the redevelopment, conservation, refurbishment and change of use of nos. 31, 32 and 33 South Terrace, Cork. The proposed development consists of the construction of a 103-no. bedroom aparthotel and all ancillary site development works. The proposed development consists of or comprises the carrying out of works to Protected Structures. Permission is being sought for the partial demolition to the rear of no. 31 South Terrace, internal and external modifications, the refurbishment and change of use of the existing buildings and the construction of a 5 floor over ground floor and lower ground floor annex to the rear of the Protected Structures. The annex will be connected to the existing buildings by means of a glazed link at ground floor to the rear of no. 31 South Terrace. The proposed development contains reception areas, dining and resident lounge spaces, fitness room, a kitchen, storage, staff welfare areas and servicing and plant, including ESB substation and switch room, refuse and bicycle storage areas. The proposal also includes an external landscaped courtyard and green roof. Permission is also sought for all associated site works, including water/wastewater services, landscaping, lighting and ancillary signage. The proposed development includes customer entrances from Cotters Street and South Terrace, with a new entrance to the north of the site also from Cotters Street.
- Location
- Co. Cork Map
- Council
- Cork City Council
- Planning reference
- 2240897
Numbers and dates
- Project type
- Infrastructure
- Received
- 25 Feb 2022
- Decision to grant
- 21 Dec 2022
- Final grant
- 10 Feb 2023
- Site start notified
- 26 Nov 2025
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2240897 on planning.corkcity.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Cork City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 26 Nov 2025Notice filed · The proposed redevelopment, conservation, refurbishment and change of use of no.s 31, 32...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.