Infrastructure, Midleton, Cork - Planning Application 23/4602

Cork / Midleton / Midleton, Cork

Est. value €3m–10m
Units Not listed
Floor area 4,944 m²
Commenced 9 Sep 2024

Source-linked planning record

Infrastructure, Midleton, Cork - Planning Application 23/4602

Cork / Midleton / Midleton, Cork
PB ref
PB-48332
Plan ref
23/4602
Authority
Cork County Council
Stage / date
Commencement / 9 Sep 2024
Est. value band
€3m–10m
Units / floor
4,944 m²
Project class
Infrastructure
Promoter
Irish Distillers Ltd
Architect / agent
PM Group Contracting Ltd

Source: https://planning.agileapplications.ie/corkcoco/application-details/?ref=23/4602

Key facts

Lead summary

Source
Owner-supplied commencement export
Planning authority
Cork County Council
Application reference
23/4602
Applicant
Irish Distillers Ltd
Agent
PM Group Contracting Ltd
Decision stage
Commencement
Commenced
9 Sep 2024
Floor area
4,944 m²
Builder / developer
PM Group Contracting Ltd

Official description

Verbatim source text

The extension and expansion of the existing Midleton Distillery and all associated site development works. The proposed development includes, (A) a 2 storey over basement ‘pot still’ building with ancillary pot still tank farm and mechanical vapour recompression (MVR) building. (B) a 2-9 storey ‘column still’ building with ancillary column still tank farm and cooling tower, (C) a 3-7 storey over partial basement ‘brewhouse’ building with ancillary fermenter structures, (D) a pipe rack structure connecting the proposed pot still, column still and brewhouse buildings with the existing distillery, (E) an internal link bridge crossing the Dungourney River which traverses the site, serving as a vehicular and pedestrian connection between the existing distillery and the proposed distillery extension, (F) demolition of an existing industrial building, removal of existing hardstand areas and culverting of a section of the existing mill race, to facilitate the construction of a biogas plant comprising a series of plant and tank structures, a single storey ammonia removal building and change of use and alterations of existing workshop/warehouse no. 1 and warehouse no. 3 to accommodate associated plant and equipment, (G) other ancillary structures including the construction of a single storey 38kV substation and associated electrical compound, security buildings, staff welfare buildings and car park shelters, (H) all other ancillary site development including the diversion of existing gas and ESB lines which traverse the lands, the upgrade of existing waste water treatment plant at the distillery, attenuation basins, fire water basin, noise attenuation fencing, parking areas, planted boundary berm and signage, (I) access to proposed development will be provided via a new entrance from the Old Youghal Road (R907) to the south. The proposed development will also be accessible from the existing distillery entrances from the Dungourney Road (R627) and Distillery Walk (L-9408) to the north and west of the lands. The proposed development is for modifications to an establishment to which the Major Accident Directives applies and is for the purpose of the activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) licence]. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application

Verify against official source

Project team

Named source parties

Promoter
Irish Distillers Ltd
Planning agent
PM Group Contracting Ltd
Builder / developer
PM Group Contracting Ltd

Lifecycle timeline

Application to site progress

  1. Applied

    9 Sep 2024 23/4602
  2. Decision

    Commencement notice filed 26 Jan 2024
  3. Appeal

    No appeal indexed No public appeal record is indexed against this application.
  4. Commenced

    24 Jun 2024 CN0116332CC
  5. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.