Protected structure · Co. Dublin

Grand Canal Harbour, Grand Canal Place, Dublin 8

Granted 25 Nov 2019 (final grant issued 7 Jan 2020)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 8 by email

Key facts

  • Planning application 3209/19 at Grand Canal Harbour, Grand Canal Place, Dublin 8: Atlas GP Limited intend to apply for a 10 year permission…
  • It was received by Dublin City Council on 7 Jun 2019.
  • Status: Granted 25 Nov 2019 (final grant issued 7 Jan 2020).

Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register

More planning applications in Dublin 8 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 25 Nov 2019.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Atlas GP Limited intend to apply for a 10 year permission…

PROTECTED STRUCTURE: Atlas GP Limited intend to apply for a 10 year permission for development on a site of c. 1.3872 hectares (net area 1.3240 hectares) at Grand Canal Harbour, Grand Canal Place, Dublin 8. The site is bounded by a Protected Structure (stone warehouse) fronting onto Grand Canal Place to the north; by Grand Canal Place to the east; by James's Avenue and vehicular access to Westcourt residences to the west; and by the grounds of a former Dublin City Council halting site accessed off Grand Canal Place to the south. The proposed development will supersede the previously permitted development, Reg. Ref. 3855/09, which provided for the demolition of existing structures on site (total GFA of 9,330 m²); retention, renovation, refurbishment and extension of the protected structure (RPS No. 3275) as part of a mixed use development in six blocks, over basement. Similarly, the proposed development will consist of a mixed use development in five blocks, over basement. Block 3/4 shall divide into two blocks at upper levels. The residential component shall be 'Build to Rent' scheme of 550 no. residential units with associated resident support facilities and resident services and amenities. Of the 550 no. residential units, 428 no. will be one bedroom units and 122 no. two bedroom units. Other uses (7,289 m²) within the proposed development shall be retail, medical, cafes, restaurant, childcare facility and co-working spaces. The proposed development will provide for a water feature to the south of the protected structure to represent the historic use of Grand Canal Harbour. Building height shall range from three storeys to thirteen storeys. Communal terraces, roof gardens shall be provided at roof level on Block 1, Block 2, Block 3/4 and Block 6. Balconies will be provided on all external elevations, save for Block 5 where the protected structure is located. Basement: the basement will be reduced in size from the permitted 8,149 m² to 5,572 m² with water attenuation tank as proposed. The basement will include 50 no. car parking spaces, 737 no. cycle parking spaces, and associated repair areas, plant and services, bin storage, waste compactor and other storage areas for residents' support facilities. Block 1: shall provide for a 696 m² retail unit, a cafe of 144 m², ESB substation and switchroom, and 84 m² of residents' support services at ground floor to 126 no. residential units. The block shall be 11 storeys, with maximum parapet height of 57.10mOD. A communal roof garden for residents shall be provide along with an internal atrium feature and a semi open winter garden. Block 2: shall provide for residents' amenities (1,187 m²), childcare facility(224 m²) with dedicated outdoor space of 123 m², ESB substation and switchroom, and 2 no. lobby entrances to 170 no. residential units. The block shall be 11 storeys with a maximum parapet height of 59.4mOD. At the 8th & 9th floors, the floor area is reduced to provide for communal terraces. A communal roof garden for residents shall be provided above the 11th storey with a semi open winter garden. Block 3/4: shall provide for a restaurant (454 m²), 157 m² of retail/non-retail service, ESB substation and switchroom, and two no. lobbies providing access to 133 residential units at ground floor, 1,707 m² of office space at ground and first floor. At 6th floor, the floorplate reduces to allow 2 smaller footprint blocks to emerge. Block 3 shall continue to 9 storeys while Block 4 shall continue to 13 storeys, with maximum height of 64.08mOD. Communal roof gardens for residents will be accessed from floor 6, 9, and above the final storey. A semi open winter garden will be provided on the roof of Block 4. Block 5: works to an existing four-storey warehouse building (c.1396 m²), a protected structure (RPS no. 3275), including the demolition of an existing single storey structure (c.255 m²) adjoining the building to the west & the removal of 6 no.dormer roof windows, metal bars to first floor window opes on north and south elevations, roller shutter door on north elevation, 1 no. window ope on north elevation, all internal stairs & the reinstatement of window opes on north, south and west elevations & the alteration of roof rafters & the refurbishment of external and internal stone/brick work, internal timber floors, internal timber doors and structural steelwork & the refurbishment/ replacement of slate roof finishes, roof vents, eaves rail guardings, rainwater goods, windows & the re-positioning of internal timber hoppers & the addition of 10no. roof dormer windows, 3 no. new window opes on north elevation and 4 no. new window opes on south elevation, 1 no. stair/lift core, 2 no. new entrances on north elevation including the excavation of the entire ground floor, new floor plate to section of second floor level (c.181 m²), new internal partition walls, new door opes to internal stone/brick work walls & the construction of 1 no. new three-storey extension (c.698 m²) adjoining the building to the west. The building will have a total gross floor area of c.2277 m² and will provide 1 no. retail unit (c.154 m²), 1 no. cafe unit (c.215 m²), 1 no. co-working office unit (c.1,376 m²) and 1 no. medical centre (c.532 m²). Block 6: shall provide for the basement access ramp which runs underneath the building, resident support facility (104 m²) use, ESB substation and switchroom, and two lobbies to residential units (111 no.) at ground floor. Medical use (1,630 m²) over ground and first floor, with apartments also to be provided at first floor. Apartments shall be provided for the rest of the building, which is seven storeys in total. A communal roof garden with semi open winter garden shall be provided for residents. The parapet height of Block 6 is 45.40 OD, with a corner at south at 46.075OD. Ancillary works, servicing and plant, pedestrian circulation, landscaping, cycle parking (118 at ground level to give a total of 855 spaces), vehicular set down, waste marshalling area, ventilation opes, and all associated site works. Total gross floor area of proposed redevelopment is 49,710sq.m. An Environmental Impact Assessment Report and Natura Impact Statement will be submitted to the planning authority with the application and we be made available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.

Location
Dublin 8, Co. Dublin Map
Planning reference
3209/19

Numbers and dates

Project type
Protected structure
Received
7 Jun 2019
Decision to grant
25 Nov 2019
Final grant
7 Jan 2020
Site start notified
12 May 2021
Protected structure
Yes, RPS 3275

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Services and drainageNamed in the application description
  • Crèche or childcare facilityNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 3209/19.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 12 May 2021Notice filed · phase 1 · Grand Canal Harbour Block 5: Extension & material alteration to an existing four- storey...View the site start
  2. 12 May 2021Notice filed · phase 2 · Construction of Buildings 1 & 3/4 as part of the Grand Canal Harbour Mixed-Use...View the site start
  3. 14 May 2021Notice filed · phase 3 · Construction of Buildings 2 & 6 as part of the Grand Canal Harbour Mixed-Use Residential...View the site start
  4. Completion certificate recordedRecorded in May 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  5. Completion certificate recordedRecorded in May 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  6. Completion certificate recordedRecorded in May 2021 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 8

Get alerts for Dublin 8Free. We email you when new applications appear.

Free email alerts

Get new Dublin 8 projects by email