Site start · Co. Dublin
Dublin 1, Dublin
Site start 6 Nov 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
Search the Dublin City planning registerCurrent planning applications in Dublin 1
What and where
PROTECTED STRUCTURE
PROTECTED STRUCTURE: No. 3 Parnell Street (a Protected Structure RPS. 6422) and Nos. 4, 5 & 6 Parnell Street (a corner site with Jervis Lane Upper Dublin 1) and Nos. 58 & 59 Capel Street, Dublin 1 (which abuts Jervis Lane Upper, Dublin 1 to the rear). The development will consist of: (1) demolition of Nos. 58 and 59 Capel Street (excluding the front west-facing facades, the rear east-facing facade of the building to rear of 58 Capel Street fronting Jervis Lane Upper, shared party wall between properties and the original internal structure of No. 58), (2) demolition of existing single storey structures comprising Nos 4-6 Parnell Street, (3) internal and external alterations to the existing three storey, over basement building at No. 3 Parnell Street (a protected structure) to accommodate new hotel development with original brickwork to be cleaned and repointed and new traditionall style timber windows to be provided in existing opes on front (north facing) facade, existing chimney stack to be retained and refurbished; part-removal of internal partitions/walls to faciliate reconfiguration/refurbishment of ground floor, first floor and second floor levels of No. 3 Parnell Street to facilitate proposed entrance foyer/lobby, bedrooms and connection (including new feature atrium to rear of existing building) to new hotel develoment, provision of replacement shop front on No. 3 Parnell Street with associated lighting, signage and new glazed canopy above replacement shopfront, (4) alteration of fenestration, refurbishment and extension by 1 no. storey of rear east-facing facade at 58 Capel Street, refurbishment of front west-facing facade at Nos. 58 & 59 Capel Street to original state with existing brickwork and cleaned and repointed along with the installation of new traditional-style timber windows to replace existing non-original windows; provision of replacement shopfronts to Nos. 58 & 59 Capel Street with associated lighting and signage; (5) construction of a part-five, part-six, part-seven storey (maximum height 25.36 metres from ground level) and over basement 94-bedroom contemporaty hotel on the overall site comprising the following: (i) whiskey lounge (30 sq. m.) with associated service bar, wine cellar (20 sq.m.) with associated service bar, toilets, spa facilities including steam room & sauna with associated reception area, toilets, changing rooms and office/accounts/admin space, kitchen /food prepartion areas, bicyle store, luggage store, linen store and associated laundry wash area, plant, storage, water storage attenuation tank and staff facilities at basement level; (ii) hotel entrance foyer, lobby/reception, check-in area, atrium, restaurant (162 sq.m.) accessible via Parnell Street and Jervis Lane Upper with associated kitchen space, lounge/bar/coffee area (148 sq.m.) external courtyard/seating area (64 sq.m.), cocktail/wine bar (46 sq.m) sub station and wheelchair accessible toilets at ground floor level; (iii) provision of 94 no. hotel bedrooms at ground, first, second, third, fourth, fifth and sixth floor levels; (iv) residents private lounge/bar (66 sq.m.) at sixth floor level with balcony area(36 sq.m.) to the northern & eastern elevations. Room No. 503 at fifth floor level will be served by balcony on the northern & eastern elevations and Room nos. 602 & 603 at sixth floor level will be served by balconies on the southern elevation. A light well is provided from ground to fourth floor level on the southern elevation within the south-eastern corner of the site, (6) other works proposed as part of the development iclude: (a) roof plant; (b) facade treatments to new hotel development to include brick and glazing detail with metal cladding on all elevations; (c) SuDs drainage; (d) all associate site works necesary to facilitate the developement
- Location
- Dublin 1, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3281/20
- Applicant
- Sienna Star Ltd
- Agent
- Walmac Demolition EC Ltd
- Builder
- Walmac Demolition EC Ltd
Key facts
- Floor area
- 172 m²
- Indicative value
- €<250kPlanningBrief estimate
- Project type
- Protected structure
- Site start
- 6 Nov 2024
- Protected structure
- Yes
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3281/20.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Explore the area