Save this project to account
New Application · decision due 9 Nov 2026Protected structurePre-decision · not yet granted

Protected structure, 18 Vesey Place, Monkstown, DunLaoghaire, Co. Dublin, A96...

A96 X4y6 (a Protected Structure), Dublin · Dun Laoghaire Rathdown County Council · Plan D26A/0694/WEB · PB ref PB-2394392359

The development will consist of: conservation, refurbishment and alteration works to a Protected Structure; internal alterations including the provision of a new en-suite; replacement of two non-original windows; enlargement of two existing rear openings to provide new glazed door/window assemblies to the rear elevation at...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 9 Nov 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Decision-dependent

The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 9 Nov 2026; no procurement timetable is published.

Decision due 9 Nov 2026 / Confidence: Medium
Decision deadline 9 Nov 2026

Public planning decision due date; the authority may update it.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / A scheme cannot commence under this application before permission.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

The development will consist of: conservation, refurbishment and alteration works to a Protected Structure; internal alterations including the provision of a new en-suite; replacement of two non-original windows; enlargement of two existing rear openings to provide new glazed door/window assemblies to the rear elevation at basement level; refurbishment and conversion of the basement to provide ancillary family and guest accommodation, including excavation and lowering of the existing floor level within two rear...

Ref D26A/0694/WEB Source-linked Official application description for exact planning reference D26A/0694/WEB
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

1 package
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

D26A/0694/WEB Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Dun Laoghaire Rathdown County Council
Exact reference
D26A/0694/WEB
Evidence reviewed
28 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Protected structure

Protected structure

The public application record identifies protected structure in the submitted planning scope.

D26A/0694/WEBExplicit application record
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

D26A/0694/WEBExplicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Eoghan Phipps
Planning agent
Maria McPadden

Reviewed build intelligence

What the documents establish

Government document review

Decision recorded; appeal window open and no exact commencement link. Scale reflects the permitted decision record.

3 official documents inspected · Checked 2026-09-19 · Official file index

Foul drainage

Application record · Dun Laoghaire Rathdown County Council D26A/0694/WEB official inventory date 2026-09-15: application scheme as submitted or assessed at that date, evidenced by Photovoltaic Panels Report, Scope of Work and Impact Assessment, Site Layout Plan; any later dated revision is a separate state.

What the evidence says
FOUL WATER DISPOSAL

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Site Layout Plan · p.1
Page 1 · Issued 2026-09-15 · Dun Laoghaire Rathdown County Council D26A/0694/WEB - Site Layout Plan (phasing); official inventory date 2026-09-15; retained revision sha256:d79338e99a3c · Checked 2026-09-19

FOUL WATER DISPOSAL

Surface water drainage

Application record · Dun Laoghaire Rathdown County Council D26A/0694/WEB official inventory date 2026-09-15: application scheme as submitted or assessed at that date, evidenced by Photovoltaic Panels Report, Scope of Work and Impact Assessment, Site Layout Plan; any later dated revision is a separate state.

What the evidence says
RAIN WATER DISPOSAL

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Site Layout Plan · p.1
Page 1 · Issued 2026-09-15 · Dun Laoghaire Rathdown County Council D26A/0694/WEB - Site Layout Plan (phasing); official inventory date 2026-09-15; retained revision sha256:d79338e99a3c · Checked 2026-09-19

RAIN WATER DISPOSAL

Structures retained

Application record · Dun Laoghaire Rathdown County Council D26A/0694/WEB official inventory date 2026-09-15: application scheme as submitted or assessed at that date, evidenced by Photovoltaic Panels Report, Scope of Work and Impact Assessment, Site Layout Plan; any later dated revision is a separate state.

What the evidence says
All original features

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Scope of Work and Impact Assessment · p.1
Page 1 · Issued 2026-09-15 · Dun Laoghaire Rathdown County Council D26A/0694/WEB - Scope of Work and Impact Assessment (planner_report); official inventory date 2026-09-15; retained revision sha256:bf85b07b6ca1 · Checked 2026-09-19

All original features

Boundary walls

Application record · Dun Laoghaire Rathdown County Council D26A/0694/WEB official inventory date 2026-09-15: application scheme as submitted or assessed at that date, evidenced by Photovoltaic Panels Report, Scope of Work and Impact Assessment, Site Layout Plan; any later dated revision is a separate state.

What the evidence says
Boundary walls, gates, and entrance features

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Scope of Work and Impact Assessment · p.2
Page 2 · Issued 2026-09-15 · Dun Laoghaire Rathdown County Council D26A/0694/WEB - Scope of Work and Impact Assessment (planner_report); official inventory date 2026-09-15; retained revision sha256:bf85b07b6ca1 · Checked 2026-09-19

Boundary walls, gates, and entrance features
Remaining document questions
  • Inspect any later revision the authority replaces at the same URL.
  • Link the commencement and completion events when they arrive.

3 retained official PDF revision(s) from the exact Dun Laoghaire Rathdown County Council D26A/0694/WEB file list. Machine extraction reads bounded passages; drawings are not interpreted.

Official description

Application text

The development will consist of: conservation, refurbishment and alteration works to a Protected Structure; internal alterations including the provision of a new en-suite; replacement of two non-original windows; enlargement of two existing rear openings to provide new glazed door/window assemblies to the rear elevation at basement level; refurbishment and conversion of the basement to provide ancillary family and guest accommodation, including excavation and lowering of the existing floor level within two rear basement rooms to provide suitable floor-to-ceiling height for habitable accommodation, together with associated waterproofing/tanking, thermal insulation and underfloor heating; internal insulation upgrades; installation of 16 photovoltaic panels on the roof; and all associated site and conservation works.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale D26A/0694/WEB

The development will consist of: conservation, refurbishment and alteration works to a Protected Structure; internal alterations including the provision of a new en-suite; replacement of two non-original windows; enlargement of two existing rear openings to provide new glazed door/window assemblies to the rear elevation at basement level; refurbishment and conversion of the basement to provide ancillary family and guest accommodation, including excavation and lowering of the existing floor level within two rear basement rooms to provide suitable floor-to-ceiling height for habitable accommodation, together with associated waterproofing/tanking, thermal insulation and underfloor heating; internal insulation upgrades; installation of 16 photovoltaic panels on the roof; and all associated site and conservation works.

AuthorityDun Laoghaire Rathdown County Council
ReferenceD26A/0694/WEB
StatusChecked 28 Sep 2026
Open official record