Protected structure, 22, Parnell Road, Harold's Cross, Dublin 12
5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be...
The record describes what is sought. Nothing is permitted until the authority decision.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 14 Apr 2026. / Confidence: LowDecision date 14 Apr 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be based on those at No. 21. Sash windows shall be externally putty faced with a glazing-compatible putty. The proposed slim-profiled glazing shall conform to EU directives, shall not contain...
Open scope evidenceNamed firms
Public source roles
- Arcadia Architects
- Planning agent named on the public planning record
- Submission role only; current appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Dublin City Council
- Exact reference
- WEB5398/25Sub02
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Colin Murphy & Claire McLoughlin
- Planning agent
- Arcadia Architects
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be based on those at No. 21. Sash windows shall be externally putty faced with a glazing-compatible putty. The proposed slim-profiled glazing shall conform to EU directives, shall not contain fritted glass, visible spacers, glass micro pillars, spacing dots, vacuum seals, nor plant-on glazing bars. Glass shall be clear. Draught brushes are a preferred form of draught-proofing from a conservation perspective. A detailed specification and visual samples of the proposed new casement windows to the rear extension, which shall be timber and/or steel, shall be submitted. b) A method statement for the conservation works to joinery, together with a specification and a set of drawings for the proposed timber doors at 1:10, which shall be based on surviving historic doors along the terrace. c) A methodology for the conservation repair of the threshold. d) A specification and methodology for repairs to internal historic plaster. e) A specification and methodology for the retention and protection of the culvert structure during the course of construction works. Vibration monitoring is recommended. f) A conservation-led methodology for the works to the historic boundary walls and detailed and fully annotated drawings at 1:50, cross-referenced against a photographic survey of the extant historic boundary and party walls, including details of material, sizes of stone, coursing, and mortar colour etc. The methodology shall include detail of the careful taking down of historic boundary wall elements where proposed and for the retention and protection of the remaining boundary walls during the course of works. g) 1:20 drawings of the foundations of the proposed extension, incorporating an offset that would ensure no impact (physically and in the course of development) on the historic culvert and historic boundary walls. h) 1:10 flashing details for junctions between the new extension and the historic structure together with details of all proposed finishes and materials. i) Drawings showing the location of the proposed solar panels and associated equipment such as pipe routes and/or hot water tank and the location of solar batteries, due to the potential increased fire risk associated with them. Any alarm systems that could be put in place to indicate a potential issue. The method statement should include as much detail as possible including accurate details of where the solar installations are to be located, together with details of likely impacts of the works to historic fabric, and other details such as openings, maintenance hatches, fixings and how service routes will be accommodated through the roof structure. j) Photographic samples / specifications for the flue and ventilated cap and pots and proposed cast iron rainwater goods, including the gutter to the rear elevation of the Protected Structure
Application to site progress
-
Applied 3 Jul 2026 WEB5398/25Sub02
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB5398/25Sub02
5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be based on those at No. 21. Sash windows shall be externally putty faced with a glazing-compatible putty. The proposed slim-profiled glazing shall conform to EU directives, shall not contain fritted glass, visible spacers, glass micro pillars, spacing dots, vacuum seals, nor plant-on glazing bars. Glass shall be clear. Draught brushes are a preferred form of draught-proofing from a conservation perspective. A detailed specification and visual samples of the proposed new casement windows to the rear extension, which shall be timber and/or steel, shall be submitted. b) A method statement for the conservation works to joinery, together with a specification and a set of drawings for the proposed timber doors at 1:10, which shall be based on surviving historic doors along the terrace. c) A methodology for the conservation repair of the threshold. d) A specification and methodology for repairs to internal historic plaster. e) A specification and methodology for the retention and protection of the culvert structure during the course of construction works. Vibration monitoring is recommended. f) A conservation-led methodology for the works to the historic boundary walls and detailed and fully annotated drawings at 1:50, cross-referenced against a photographic survey of the extant historic boundary and party walls, including details of material, sizes of stone, coursing, and mortar colour etc. The methodology shall include detail of the careful taking down of historic boundary wall elements where proposed and for the retention and protection of the remaining boundary walls during the course of works. g) 1:20 drawings of the foundations of the proposed extension, incorporating an offset that would ensure no impact (physically and in the course of development) on the historic culvert and historic boundary walls. h) 1:10 flashing details for junctions between the new extension and the historic structure together with details of all proposed finishes and materials. i) Drawings showing the location of the proposed solar panels and associated equipment such as pipe routes and/or hot water tank and the location of solar batteries, due to the potential increased fire risk associated with them. Any alarm systems that could be put in place to indicate a potential issue. The method statement should include as much detail as possible including accurate details of where the solar installations are to be located, together with details of likely impacts of the works to historic fabric, and other details such as openings, maintenance hatches, fixings and how service routes will be accommodated through the roof structure. j) Photographic samples / specifications for the flue and ventilated cap and pots and proposed cast iron rainwater goods, including the gutter to the rear elevation of the Protected Structure
Open official record