5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 6 Nov 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 14 Apr 2026. / Confidence: Low
Decision Decision recorded

Decision date 14 Apr 2026.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be based on those at No. 21. Sash windows shall be externally putty faced with a glazing-compatible putty. The proposed slim-profiled glazing shall conform to EU directives, shall not contain...

Ref WEB5398/25Sub02 Source-linked Official application description for exact planning reference WEB5398/25Sub02
Open scope evidence

Public source roles

Arcadia Architects
Planning agent named on the public planning record
Submission role only; current appointment status is not confirmed.

Explicit source signals only

2 packages
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

WEB5398/25Sub02 Explicit description / Source-linked Source
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

WEB5398/25Sub02 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Dublin City Council
Exact reference
WEB5398/25Sub02
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Protected structure

Protected structure

The public application record identifies protected structure in the submitted planning scope.

WEB5398/25Sub02Explicit application record
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

WEB5398/25Sub02Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

WEB5398/25Sub02Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Colin Murphy & Claire McLoughlin
Planning agent
Arcadia Architects
Official description

Application text

5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be based on those at No. 21. Sash windows shall be externally putty faced with a glazing-compatible putty. The proposed slim-profiled glazing shall conform to EU directives, shall not contain fritted glass, visible spacers, glass micro pillars, spacing dots, vacuum seals, nor plant-on glazing bars. Glass shall be clear. Draught brushes are a preferred form of draught-proofing from a conservation perspective. A detailed specification and visual samples of the proposed new casement windows to the rear extension, which shall be timber and/or steel, shall be submitted. b) A method statement for the conservation works to joinery, together with a specification and a set of drawings for the proposed timber doors at 1:10, which shall be based on surviving historic doors along the terrace. c) A methodology for the conservation repair of the threshold. d) A specification and methodology for repairs to internal historic plaster. e) A specification and methodology for the retention and protection of the culvert structure during the course of construction works. Vibration monitoring is recommended. f) A conservation-led methodology for the works to the historic boundary walls and detailed and fully annotated drawings at 1:50, cross-referenced against a photographic survey of the extant historic boundary and party walls, including details of material, sizes of stone, coursing, and mortar colour etc. The methodology shall include detail of the careful taking down of historic boundary wall elements where proposed and for the retention and protection of the remaining boundary walls during the course of works. g) 1:20 drawings of the foundations of the proposed extension, incorporating an offset that would ensure no impact (physically and in the course of development) on the historic culvert and historic boundary walls. h) 1:10 flashing details for junctions between the new extension and the historic structure together with details of all proposed finishes and materials. i) Drawings showing the location of the proposed solar panels and associated equipment such as pipe routes and/or hot water tank and the location of solar batteries, due to the potential increased fire risk associated with them. Any alarm systems that could be put in place to indicate a potential issue. The method statement should include as much detail as possible including accurate details of where the solar installations are to be located, together with details of likely impacts of the works to historic fabric, and other details such as openings, maintenance hatches, fixings and how service routes will be accommodated through the roof structure. j) Photographic samples / specifications for the flue and ventilated cap and pots and proposed cast iron rainwater goods, including the gutter to the rear elevation of the Protected Structure

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale WEB5398/25Sub02

5. Prior to the commencement of the development, the applicant/developer shall submit for the written approval of the planning authority: a) Windows: The applicant shall submit a set of drawings at 1:10, for the proposed timber sash windows. The detailing of the windows, including proposed horns and glazing bars, shall be based on those at No. 21. Sash windows shall be externally putty faced with a glazing-compatible putty. The proposed slim-profiled glazing shall conform to EU directives, shall not contain fritted glass, visible spacers, glass micro pillars, spacing dots, vacuum seals, nor plant-on glazing bars. Glass shall be clear. Draught brushes are a preferred form of draught-proofing from a conservation perspective. A detailed specification and visual samples of the proposed new casement windows to the rear extension, which shall be timber and/or steel, shall be submitted. b) A method statement for the conservation works to joinery, together with a specification and a set of drawings for the proposed timber doors at 1:10, which shall be based on surviving historic doors along the terrace. c) A methodology for the conservation repair of the threshold. d) A specification and methodology for repairs to internal historic plaster. e) A specification and methodology for the retention and protection of the culvert structure during the course of construction works. Vibration monitoring is recommended. f) A conservation-led methodology for the works to the historic boundary walls and detailed and fully annotated drawings at 1:50, cross-referenced against a photographic survey of the extant historic boundary and party walls, including details of material, sizes of stone, coursing, and mortar colour etc. The methodology shall include detail of the careful taking down of historic boundary wall elements where proposed and for the retention and protection of the remaining boundary walls during the course of works. g) 1:20 drawings of the foundations of the proposed extension, incorporating an offset that would ensure no impact (physically and in the course of development) on the historic culvert and historic boundary walls. h) 1:10 flashing details for junctions between the new extension and the historic structure together with details of all proposed finishes and materials. i) Drawings showing the location of the proposed solar panels and associated equipment such as pipe routes and/or hot water tank and the location of solar batteries, due to the potential increased fire risk associated with them. Any alarm systems that could be put in place to indicate a potential issue. The method statement should include as much detail as possible including accurate details of where the solar installations are to be located, together with details of likely impacts of the works to historic fabric, and other details such as openings, maintenance hatches, fixings and how service routes will be accommodated through the roof structure. j) Photographic samples / specifications for the flue and ventilated cap and pots and proposed cast iron rainwater goods, including the gutter to the rear elevation of the Protected Structure