GrantedDecision recorded

5 dwellings, Groody Road, Newcastle Castletroy, Limerick

Newcastle Castletroy, Limerick · Limerick City and County Council · Plan 2560113 · PB ref PB-10000474135

a Large-Scale Residential Development (LRD) - development of a Purpose-Built Student Accommodation (PBSA) scheme on land fronting the Groody Road and Dublin Road, Castletroy, in the townland of Newcastle, Limerick for a period of seven years. The development consisting of 196 no. Bed Clusters, is distributed across 5 no...

Indicative value €1m–3m PB indicative band
Units applied for 5 public application record
Floor area Not listed no reliable figure indexed
Decision 25 Sep 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 25 Sep 2025. / Confidence: Low
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

a Large-Scale Residential Development (LRD) - development of a Purpose-Built Student Accommodation (PBSA) scheme on land fronting the Groody Road and Dublin Road, Castletroy, in the townland of Newcastle, Limerick for a period of seven years. The development consisting of 196 no. Bed Clusters, is distributed across 5 no. separate blocks, ranging in height from 5 - 8 storeys, with a total of 1,400 no. student bedspaces to be delivered in two phases of development including: (i) Block A comprising 8 storeys...

Ref 2560113 Source-linked Official application description for exact planning reference 2560113
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

2 packages
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2560113 Explicit description / Source-linked Source
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2560113 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Limerick City and County Council
Exact reference
2560113
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Temporary/event

Temporary/event - 5 dwellings

The public application record identifies 5 dwellings in the submitted planning scope.

2560113Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2560113Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2560113Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

a Large-Scale Residential Development (LRD) - development of a Purpose-Built Student Accommodation (PBSA) scheme on land fronting the Groody Road and Dublin Road, Castletroy, in the townland of Newcastle, Limerick for a period of seven years. The development consisting of 196 no. Bed Clusters, is distributed across 5 no. separate blocks, ranging in height from 5 - 8 storeys, with a total of 1,400 no. student bedspaces to be delivered in two phases of development including: (i) Block A comprising 8 storeys providing for (a) 28 no. bed clusters and 224 no. bedspaces; (b) Student library; (c) Student union; (d) Plant room; (e) Bin store; (f) Bicycle store; (ii) Block B comprising 7 storeys providing for (a) 52 no. bed clusters and 400 no. bedspaces; (b) Reception & Office; (c) Post room; (d) Laundry room; (e) Student canteen; (f) Maintenance store; (g) Plant room; (h) ESB sub station & switch room; (i) Bin Storage; (j) and Bicycle store; (iii) Block C comprising 6 storeys providing for (a) 51 no. bed clusters and 355 no. bedspaces; (b) Student Gym; (c) Maintenance store; (d) Plant room; (e) ESB sub station & switch room; (f) Bin Storage; (g) and Bicycle store; (iv) Block D comprising 6 storeys providing for (a) 32 no. bed clusters and 211 no. bedspaces; (b) Reception & Office; (c) Post room; (d) Laundry room; (e) Student canteen; (f) Student supply retail unit (60 m²); (g) Plant room; (h) Maintenance store; (i) Bin Storage; and (k) Bicycle Storage; (v) Block E comprising 5 storeys providing for (a) 33 no. bed clusters and 210 no. bedspaces; (b) Reception & Office; (c) Laundry room; (d) Maintenance store; (e) Bicycle store; and (f) Plant room; and (vi) ancillary site development works including car and bicycle parking provision; boundary treatments; roof plant; public lighting; water supply; foul and surface water drainage infrastructure; signage; and a temporary construction access to facilitate Phase 2. Vehicular access to the site will be from the Groody Road with pedestrian access to the Dublin Road. Extensive landscaping proposals, including (a) landscaped courtyards; (b) pedestrian and cycle connections from the Groody Road to the Groody Green Wedge; (c) natural landscaping and public walkways within the Groody Green Wedge; and (d) a Wetland area adjacent to the Groody River are also proposed. Planning permission is also sought for use of the accommodation, outside of student term time, for short-term letting purposes. The planning application is

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2560113

a Large-Scale Residential Development (LRD) - development of a Purpose-Built Student Accommodation (PBSA) scheme on land fronting the Groody Road and Dublin Road, Castletroy, in the townland of Newcastle, Limerick for a period of seven years. The development consisting of 196 no. Bed Clusters, is distributed across 5 no. separate blocks, ranging in height from 5 - 8 storeys, with a total of 1,400 no. student bedspaces to be delivered in two phases of development including: (i) Block A comprising 8 storeys providing for (a) 28 no. bed clusters and 224 no. bedspaces; (b) Student library; (c) Student union; (d) Plant room; (e) Bin store; (f) Bicycle store; (ii) Block B comprising 7 storeys providing for (a) 52 no. bed clusters and 400 no. bedspaces; (b) Reception & Office; (c) Post room; (d) Laundry room; (e) Student canteen; (f) Maintenance store; (g) Plant room; (h) ESB sub station & switch room; (i) Bin Storage; (j) and Bicycle store; (iii) Block C comprising 6 storeys providing for (a) 51 no. bed clusters and 355 no. bedspaces; (b) Student Gym; (c) Maintenance store; (d) Plant room; (e) ESB sub station & switch room; (f) Bin Storage; (g) and Bicycle store; (iv) Block D comprising 6 storeys providing for (a) 32 no. bed clusters and 211 no. bedspaces; (b) Reception & Office; (c) Post room; (d) Laundry room; (e) Student canteen; (f) Student supply retail unit (60 m²); (g) Plant room; (h) Maintenance store; (i) Bin Storage; and (k) Bicycle Storage; (v) Block E comprising 5 storeys providing for (a) 33 no. bed clusters and 210 no. bedspaces; (b) Reception & Office; (c) Laundry room; (d) Maintenance store; (e) Bicycle store; and (f) Plant room; and (vi) ancillary site development works including car and bicycle parking provision; boundary treatments; roof plant; public lighting; water supply; foul and surface water drainage infrastructure; signage; and a temporary construction access to facilitate Phase 2. Vehicular access to the site will be from the Groody Road with pedestrian access to the Dublin Road. Extensive landscaping proposals, including (a) landscaped courtyards; (b) pedestrian and cycle connections from the Groody Road to the Groody Green Wedge; (c) natural landscaping and public walkways within the Groody Green Wedge; and (d) a Wetland area adjacent to the Groody River are also proposed. Planning permission is also sought for use of the accommodation, outside of student term time, for short-term letting purposes. The planning application is

AuthorityLimerick City and County Council
Reference2560113
StatusChecked 2 Jun 2026
Open official record