Temporary/event · Co. Limerick

at Ballygiltenan North Caheragh Glin Demesne, and Killacolla (Barker) (Townlands), Glin Co. Limerick

Granted 27 Jan 2026 (final grant issued 2 Mar 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560828 at At Ballygiltenan North Caheragh Glin Demesne, And Killacolla (Barker) (Townlands), Glin Co. Limerick: 10 year permission for.
  • It was received by Limerick City and County Council on 21 Aug 2025.
  • Status: Granted 27 Jan 2026 (final grant issued 2 Mar 2026).
  • Permission was granted on 27 Jan 2026 and the final grant issued on 2 Mar 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Limerick City and County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Limerick

What and where

10 year permission for

a 10 year permission for (1) the construction of a wastewater treatment plant at Caheragh, Glin, including rising mains discharge chamber, inlet works with screen, flow distribution chamber with flow monitoring, 2 no. primary settlement tanks with splitter chamber, sludge pumping station and sludge holding tank, storm storage tank, tidal tank, control building, surface water drainage network including swale linking to existing drains, site lighting (both task lighting and road lighting), boundary fencing, landscaping and biodiversity enhancements, solar panels on block mounted frames, and entrance scheme signage. Access to the wastewater treatment plant to be provided via a proposed new entrance onto the public road network to the south (L-6106), below ground interconnecting pipework; (2) the construction of a wastewater terminal pumping station (TPS) including: underground storm storage tank, pump sump chamber, flow meter chamber, overflow chamber with screen, 2 no. valve chambers, bauer connection chamber, wet and control kiosks, vent stack, landscaping to include redesign of Town Park public amenity area, removable bollards, the temporary removal and re-instatement of a portion of the wall, and all ancillary site development works at Ballygiltenan North, Glin; (3) Foul water rising main between the wastewater treatment plant site and terminal pumping station comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (4) Gravity storm overflow pipeline from terminal pump station to a new outfall in the maritime area comprising the laying of pipework within the town park and Coast Road (N69) including a rodding and scour chamber;(5) the construction of a new effluent outfall gravity pipeline from wastewater treatment plant site to a new outfall in the maritime area comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (6) partial demolition/decommissioning of the existing tidal tanks and decommissioning of the existing outfall pipeline assets landwards of the High Water Mark (HWM) within the Town Park public amenity area; (7) Proposed upgrades to underground foul sewer network at the junction of Mary Street and Coast Road (N69) comprising the laying of new sewer pipework to the terminal pumping station and; (8) all associated site development and site excavation works above and below groun

Description as published by the council. Its text starts part-way through a sentence.

Location
And Killacolla (barker) (townlands), Co. Limerick Map
Planning reference
2560828

Numbers and dates

Project type
Temporary/event
Received
21 Aug 2025
Decision to grant
27 Jan 2026
Final grant
2 Mar 2026

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued

Outlook

What happens next

Permission was granted on 27 Jan 2026 and the final grant issued on 2 Mar 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560828 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Limerick City and County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near And Killacolla (barker) (townlands)

Get alerts for Co. LimerickFree. We email you when new applications appear.

Free email alerts

Get new Limerick projects by email

New applications, decisions and site starts in Co. Limerick. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options