GrantedDecision recorded

Infrastructure, Carrane Hill Wind Farm, townlands of Carrownadargny near...

Townlands Of Carrownadargny Near Geevagh, Sligo · Sligo County Council · Plan 2460315 · PB ref PB-10000371575

a twenty (20) year planning permission for continuations of the operational life of the existing wind farm (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing wind farm which...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 7 Nov 2024 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 7 Nov 2024. / Confidence: Low
Decision CONDITIONAL

Decision date 7 Nov 2024.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

a twenty (20) year planning permission for continuations of the operational life of the existing wind farm (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing wind farm which comprises the follow elements: a. 4 no. existing wind turbines with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite electrical substation compound which includes a control...

Ref 2460315 Source-linked Official application description for exact planning reference 2460315

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Sligo County Council
Exact reference
2460315
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

2460315Explicit application record
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2460315Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

a twenty (20) year planning permission for continuations of the operational life of the existing wind farm (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing wind farm which comprises the follow elements: a. 4 no. existing wind turbines with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling; c. All associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; d. Existing site access tracks of c.1.5km in length and 4 no. turbines hardstandings; e. Existing site drainage and; f. All existing ancillary infrastructure, associated site fencing and signage

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460315

a twenty (20) year planning permission for continuations of the operational life of the existing wind farm (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing wind farm which comprises the follow elements: a. 4 no. existing wind turbines with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling; c. All associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; d. Existing site access tracks of c.1.5km in length and 4 no. turbines hardstandings; e. Existing site drainage and; f. All existing ancillary infrastructure, associated site fencing and signage

AuthoritySligo County Council
Reference2460315
StatusChecked 2 Jun 2026
Open official record