Infrastructure · Co. Tipperary
Stafford Street, Nenagh South, Nenagh, Co. Tipperary
Granted 9 Nov 2018 (final grant issued 14 Dec 2018)
We no longer update this application, so we can't email you about it. Get new planning applications in Nenagh by email
Key facts
- Planning application 18600821 at Stafford Street, Nenagh South, Nenagh, Co. Tipperary: Infrastructure works.
- It was received by Tipperary County Council on 29 Jun 2018.
- Status: Granted 9 Nov 2018 (final grant issued 14 Dec 2018).
Source: the Tipperary County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Nenagh · Planning applications in Co. Tipperary
Council register
The council's register shows: Granted on 9 Nov 2018.
Search the Tipperary planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Infrastructure works
development at existing dairy processing facility consisting of 3no. main elements; 1.Re-location of main access to the dairy processing plant frm Stafford St to Kenyon St/Well Rd roundabout junction & upgrade of existing milk intake facilities with assoc. site dev works; 2.Expansion of existing casein processing plant facility; 3.Upgrade of existing WWTP; Element no.1 shall re-locate site access, a)upgrade works to existing Kenyon St/Well Rd roundabout junction;b)new security control building (approx.fl area 69 m²);c)extension/upgrade of existing milk intake facility;d)new facilities for truck cleaning with canopy roof over;e)2no. new truck weighbridges;f)demolition works to facilitate above works including demolition of the former Railway Bar & Suttons Coal Yard properties adjoining Arrabawn Co-op site & demolish of exist security control building within the site;g)all site dev works to include works to boundary walls, fencing & gates, footpaths, internal service roads & roundabout, car parks, road lighting, drainage, utility services, line marking & signage;h)construction of temp car park adjacent to Arrabawn Co-op’s head office on Stafford St. Element no.2- building extensions to existing casein plant building(approx.fl area 2586 m²) to accommodate new process plant installations to facilitate an increase in dairy processing capacity & all assoc. site works incl relocation of exist external silos, compactor & prefabricated storage unit, removal of existing external storage containers & plant, relocation of internal gateway to the mart site & works to road pavement, utility services & drainage. Element no.3 the installation of wastewater treatment tanks;a)aeration tank 22m dm x 6m high;b)settlement tank l9m dm x 5m high; c)covered sludge tank l2m dm x 5m high along with an extension to exist sludge de-watering building (approx.fl area 37 m²), construction of laboratory/office build(approx.fl area 36 m²), air blower building (approx. fl area 2l2sqm), 2no. air blower enclosure structures(approx.base areas 43 m² & 24 m²), additional plant & equipment installations along with assoc internal access Rd, site works & drainage works all within existing WWT site complex. An EIAR(Environmental Impact Assessment Report) has been submitted. These relate to activities for which an application for review of Industrial Emissions Licence (P0 791-02) is required to the EPA
- Location
- Nenagh, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 18600821
Numbers and dates
- Floor area
- 2,795 m²
- Project type
- Infrastructure
- Received
- 29 Jun 2018
- Decision to grant
- 9 Nov 2018
- Final grant
- 14 Dec 2018
- Site start notified
- 31 Dec 2018
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 18600821 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Tipperary County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 31 Dec 2018Notice filed · phase 1 · Extension to Existing Casein Plant Building and associated Site Works at Arrabawn...View the site start
- 9 Jun 2022Notice filed · phase 2 · Construction of new single storey security control/reception building (71sqm floor area)...View the site start
- Completion certificate recordedRecorded in Dec 2018 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.