Save this project to account

Site start · Co. Tipperary

Nenagh, Tipperary

Site start 16 Mar 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 10 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

~51 homes

51 no. residential units which will comprise the following: a) 2 no. 2 storey detached apartment blocks, each with 2 number 1 and 2 bed apartments on ground floor and 2 number 1 and 2 bed apartments on first floor (total number of apartments in the 2 blocks total 16 units), b) 11 no. 3 bed 2-storey end-terrace houses (Type J & Jh’), c) 21 no. 2 bed 2-storey mid-terrace houses (Type K & Kh’), d) 3 no. 3 bed 2-storey end-terrace houses (Type L & Lh’), PERMISSION also for the demolition of 3 no. unfinished 2 storey dwellings and for the demolition of 3 no. foundations and bases for 3 no. 2 storey dwellings, all associated site works to include the following: new vehicular road and pedestrian access from the existing access on Dromin Road, new vehicular roads and pedestrian accesses from the extended access road, new boundary treatments, landscaping, public lighting, car parking, signage, bin storage and bicycle storage, together with all associated drainage connection works to include proposed surface water drainage to existing watercourse on Western boundary, proposed connection to existing foul sewer within site, water supply connection from existing water supply within site, together with all other associated site works, A Natura Impact Statement accompanies this application

Location
Nenagh, Co. Tipperary Map
Planning reference
2260564
Applicant
Dromin Nenagh Property Development LTD
Agent
Quantum Homes Ltd
Builder
Quantum Homes Ltd

Key facts

Homes
~51estimated from the application
Floor area
3,133 m²
Project type
Large residential
Site start
16 Mar 2026

Documents and evidence

Check the record

  • Council planning fileThe application file 2260564 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from design statement in the council's file.
    Unit mix
    16 1/2 bedroom apartment, 14 3 bedroom end terrace house, 21 2 bedroom mid terrace house
    Site area
    1.03 ha
    Applicant
    Dromin Nenagh Property Development LTD
    Phasing
    Phase 2 of a 4-phase masterplan
    Scope
    The proposed development consists of 51 residential units, including apartment blocks and terraced houses, with associated amenities and landscaping on a 1.03-hectare site.
    Rainwater
    “RWP to foul water sewers and surface water sewers indicated”
    Wastewater
    “Foul water connects to proposed foul water sewer”
    Heat pump
    “Air to water heating system noted”
    Landscaping
    “Open space 981 sq.m. and private amenity space provided”

How we know this

From the Tipperary County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 16 Mar 2026Work started · phase 1 · Construction of Apartment Block Z
  2. 20 Mar 2026Work started · phase 2 · Construction of apartment block Y
  3. 27 Mar 2026Work started · phase 3 · Construction of units 19-53 The Crescent

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Nenagh

Get alerts for NenaghFree. We email you when new applications appear.

Free email alerts

Get new Nenagh projects by email

New planning applications, decisions and site starts in Nenagh, Co. Tipperary. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options