Site start · Co. Tipperary
Cashel, Tipperary
Granted 16 Apr 2024 (final grant issued 20 May 2024)
Key facts
- Site start record 2361027 at Cashel, Co. Tipperary: Large Scale Residential Development.
- The planning authority is Tipperary County Council.
- Status: Granted 16 Apr 2024 (final grant issued 20 May 2024).
Source: the Tipperary County Council planning register, as last seen on 10 Jun 2026. Open the council's file
More planning applications in Cashel · Planning applications in Co. Tipperary
Council register
The council's register shows: Granted on 16 Apr 2024.
Search the Tipperary planning register
Application details as we last saw them in the national register on 10 Jun 2026.
What and where
Large Scale Residential Development
Commencement Notice a Large Scale Residential Development at Wallers Lot / Hughes Lot East, Cashel, Co. Tipperary. The site is bounded by the Bregawn residential estate currently under construction to the South, Cathal Brugha Street and Ard Mhuire Estate to the West, residential and amenity zoned lands to the North and East. The development will consist of the demolition of an existing agricultural building and the erection of 139 Dwellings and Creche on a site area of 4.51 Hectares. The development is accessed from a new southern roundabout junction at the R692 Upper Green Road (Clonmel Road) and more specifically described as: • Demolition of existing steel portal framed and concrete block agricultural buildings • 8no two storey two bedroom terraced dwellings • 36no two storey three bedroom semi-detached dwellings • 66no two storey four bedroom semi detached dwellings • 9no two storey four bedroom detached dwellings • 20no Apartments in a three storey block comprising at Ground Floor 2no 1 bedroom and 2no 2 Bedroom Apartments; at First Floor 4no 1 bedroom and 4no 2 Bedroom apartments; at second Floor 4no 1 bedroom and 4no 2 Bedroom Apartments • Creche with a gross floor area of 286 m² located with the Ground Floor of the 3 Storey Apartment Building, creche external play area, Bin store and covered bicycle stand • 276no car parking spaces (250no spaces for dwellings, 26no visitor and Creche parking spaces, Creche set-down area, 20 secure bicycle spaces and 6 visitor bicycle spaces for the Apartments and Creche. • Private, communal and public landscaped amenity spaces, internal estate road network, pedestrian pavement network, a new pedestrian pavement extending to the North-West boundary of the proposal, inter-site boundary walls and fences, new site boundary walls and fences, undergrounding of existing overhead electricity supply cables traversing the development site, ESB sub station, public lighting, public drainage and water services connections and associated site development works
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Cashel, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 2361027
- Application type
- Commencement Notice
- Owner named on the notice
- JSF Construction
- Agent named on the notice
- JSF Construction
Numbers and dates
- Project type
- Small residential
- Received
- 21 Dec 2023
- Decision to grant
- 16 Apr 2024
- Final grant
- 20 May 2024
- Site start notified
- 20 Jun 2024
Documents and evidence
Check the record
- Council planning fileThe application file 2361027 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from P.10.06 Statement of Consistency in the council's file.
- Unit mix
- 10 1-bed apartment, 10 2-bed apartment, 8 2-bed terraced house, 36 3-bed semi-detached house, 66 4-bed semi-detached house, 9 4-bed detached house
- Site area
- 4.51 ha
- Applicant in the planning documents
- JSF Property Holding Ltd
- Scope
- Demolition of agricultural buildings and construction of 139 dwellings, creche, and associated site works on 4.51 hectares in Cashel, Co. Tipperary.
How we know this
From the Tipperary County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 20 Jun 2024Notice filed · phase 1 · Construction of Houses No.81 to 95 & 180 to 203 inclusive & associated site works.View the site start
- 7 Oct 2024Notice filed · phase 2 · Construction of 20no Apartments in a three storey block comprising at Ground Floor a...View the site start
- 31 Dec 2024Notice filed · phase 3 · Phases 2c, 2d & 2e, construction of 78 dwellings houses, plot numbers 96 to 153, plot...View the site start
- Completion certificate recordedRecorded in Jun 2024 · 7 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Jun 2024 · 6 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Jun 2024 · 14 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area