Large residential · Co. Tipperary
Sir Johns Road, Ballynagrana Carrick on Suir, Co. Tipperary
Granted 25 Oct 2024 (final grant issued 28 Nov 2024)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Tipperary by email
Key facts
- Planning application 2460730 at Sir Johns Road, Ballynagrana Carrick on Suir, Co. Tipperary: Change of design of house types previously granted under planning…
- The applicant is JSF Property Holding LTD..
- It was received by Tipperary County Council on 3 Sep 2024.
- Status: Granted 25 Oct 2024 (final grant issued 28 Nov 2024).
Source: the Tipperary County Council planning register, as last seen on 7 Aug 2026. Open the council's file
Council register
The council's register shows: Granted on 25 Oct 2024.
Search the Tipperary planning register
Application details as we last saw them in the national register on 7 Aug 2026.
What and where
Change of design of house types previously granted under planning…
a change of design of house types previously granted under planning reference no. 22/339 on this site at Sir Johns Road, Ballynagrana, Carrick on Suir, Co Tipperary. The site is bounded by the Gleann na Locha residential estate to the South, agricultural land to the North and West with amenity and new residential zoned lands to the East. Permission is granted under planning reference number 22/339 for 41 dwellings. The proposed House Type design changes are more specifically described as: • Change of design for House Type A (4 Bedroom 3 storey dwelling to a 2 storey 4 Bedroom dwelling) 14no Dwellings • Change of design for House Type B (2 Bedroom dwelling) 7no. dwellings • Change of design for House Type C (3 Bedroom dwelling) 20no. dwellings. • Changes to fenestration for all House Types including change from painted render finishes to brickwork and textured render finishes
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Ballynagrana Carrick On Suir, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 2460730
- Applicant
- JSF Property Holding LTD.
Numbers and dates
- Floor area
- 4,449 m²
- Estimated construction value
- €6.7m to €8.6mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 3 Sep 2024
- Decision to grant
- 25 Oct 2024
- Final grant
- 28 Nov 2024
- Site start notified
- 27 Dec 2024
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Site history
This site's history
-
Earlier permission 22339 for this site: granted 20 Dec 2022.
the construction of 56 New Houses consisting of 35 Three bed houses, 20 Two bed houses and 1 Four bed house along with a foul sewer pumping… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460730 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from P.10.08 Architectural Design Statement in the council's file.
- Unit mix
- 14 House Type A, 7 House Type B, 20 House Type C
- Applicant in the planning documents
- JSF Property Holding LTD.
- Scope
- Application seeks to change the design of three house types (A, B, C) from painted render to brickwork and textured render, with fenestration changes.
- Cladding
- “change from painted render finish to brickwork and textured render finish”
- Rainwater
- “black UPVC rainwater goods”
How we know this
From the Tipperary County Council planning register, as last seen on 7 Aug 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 27 Dec 2024Notice filed · Construction of 41 dwellings houses, plot numbers 1 to 41View the site start
- Completion certificate recordedRecorded in Dec 2024 · 9 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area