Infrastructure · Co. Tipperary

Dew Valley Foods, Holycross Road Thurles, Co. Tipperary

Granted 15 Dec 2025 (final grant issued 27 Jan 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2460987 at Dew Valley Foods, Holycross Road Thurles, Co. Tipperary: 10-year permission for the development which will consist…
  • It was received by Tipperary County Council on 18 Nov 2024.
  • Status: Granted 15 Dec 2025 (final grant issued 27 Jan 2026).
  • Permission was granted on 15 Dec 2025 and the final grant issued on 27 Jan 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Tipperary County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Tipperary

What and where

10-year permission for the development which will consist of the…

a 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising: 1) construction of an 11,267 m² extension to the existing food manufacturing facility, including: (a) cold storage areas; (b) two-storey office space, toilet block, and drivers’ area; (c) new processing, packing, intake/dispatch areas; (d) electrical plant, maintenance rooms, and external steel access staircases; (e) new gas tanks, transformer compound, and pipe bridge; 2) construction of an 1,500 m³ storage building for packaging and machinery; 3) extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²); 4) construction of an 110 m² waste collection building; 5) extension to the existing water treatment plant (WTP) building (70 m²); 6) expansion of the high temperature (HT) plant room (64 m²); 7) construction of 4 no. tanks; 8) installation of 3 no. bunded kerosene tanks (50,000 L each); 9) construction of a 16 m high boiler stack; 10) construction of new internal access roads (c. 8,825 m²); 11) creation of a 520 m² internal courtyard area; 12) construction of a 630 m² external storage compound; 13) construction of a 3,120 m³ stormwater attenuation pond and discharge line; 14) installation of a standby treated effluent discharge pipeline (1,490 m); 15) realignment and expansion of site boundary, including new boundary walls, fencing and planting; 16) provision of an additional 8 no. truck parking spaces; 17) relocation of the existing fuel tank and weighbridge; 18) expansion of the existing sprinkler pump house (24 m²); 19) conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces; 20) installation of new site lighting; 21) demolition of existing buildings and structures (total 1,840 m²); and 22) all ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this application

Description as published by the council. Its text starts part-way through a sentence.

Location
Holycross Road Thurles, Co. Tipperary Map
Planning reference
2460987
Council planning fileGet alerts

Numbers and dates

Floor area
23,707 m²
Project type
Infrastructure
Received
18 Nov 2024
Decision to grant
15 Dec 2025
Final grant
27 Jan 2026

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued

Outlook

What happens next

Permission was granted on 15 Dec 2025 and the final grant issued on 27 Jan 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2460987 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Tipperary County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Holycross Road Thurles

Get alerts for Co. TipperaryFree. We email you when new applications appear.

Free email alerts

Get new Tipperary projects by email

New applications, decisions and site starts in Co. Tipperary. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options