Development Description
upgrades to the existing Kilsheelan Wastewater Treatment Plant comprising new inlet works; decommissioning the existing Storm Water Overflow (SWO); an upgrade of existing secondary treatment process; upsizing of sections of the inlet and outlet pipes; a new interprocess pumping station; a new storm water management system, including a storm tank and associated infrastructure; provision of a new above ground sludge storage tank; a new gravity pipeline; the decommissioning and demolishing the existing septic tank currently serving the Poll an Choire estate; material widening of an existing entrance and a new access road; an upgrade of the existing control building, which will include a rainwater harvesting system; the construction of a new welfare building; Ancillary Mechanical Electrical Instrumentation Control and Automation (MEICA) works; the relocation of some existing infrastructure; the installation of a ground mounted solar photovoltaic (PV) array and associated ancillary works including siteworks. (A Natura Impact Statement (NIS) has been prepared for the proposed development, and an application will be submitted to the Environmental Protection Agency for a revision of the current Wastewater Discharge Licence
Map
No coordinates supplied in the public planning feed.