Large residential · Co. Tipperary

Tivoli Road, Powerstown, Clonmel Co. Tipperary

Granted 23 Jan 2026 (final grant issued 26 Feb 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560643 at Tivoli Road, Powerstown, Clonmel Co. Tipperary: 30 homes.
  • The applicant is Greenrise Developments Ltd. The agent is Ronan Sweeney.
  • It was received by Tipperary County Council on 4 Jul 2025.
  • Status: Granted 23 Jan 2026 (final grant issued 26 Feb 2026).
  • Permission was granted on 23 Jan 2026 and the final grant issued on 26 Feb 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Tipperary County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Tipperary

What and where

30 homes

(a) the demolishing of existing agricultural sheds and stone wall to the front of the site, (b) the construction of 30 no. 2 storey dwellings consisting of 17 no. 3 beds units and 13 no. 4 beds units arranged in 4 no. terrace blocks of four dwellings and 7 no. semi detached dwellings, (c) the provision of public and private open space, car parking, bin storage, public lighting, landscaping, boundary treatments, internal roads and footpaths, pedestrian access and site entrance onto Tivoli Road, connections to existing services and all associated development including new public footpath to west of site

Location
Powerstown, Co. Tipperary Map
Planning reference
2560643

Numbers and dates

Homes
30
Floor area
3,450 m²
Estimated construction value
€5.2m to €6.7mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Large residential
Received
4 Jul 2025
Decision to grant
23 Jan 2026
Final grant
26 Feb 2026

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued

Outlook

What happens next

Permission was granted on 23 Jan 2026 and the final grant issued on 26 Feb 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • RoofingNamed in the planning documents
  • CladdingNamed in the planning documents
  • Windows/doorsNamed in the planning documents
  • LandscapingNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560643 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Architectural design statement 3 in the council's file.
    Unit mix
    20 3-bed house, 10 4-bed house
    Applicant in the planning documents
    Greenrise Developments Ltd
    Scope
    The proposed development comprises 30 two-storey houses with a mix of 3-bed and 4-bed units, designed with a clear street hierarchy, public open space, and high-quality materials.
    Roofing
    “dark coloured concrete roof tile”
    Cladding
    “high-quality brick finish on primary elevations”
    Windows/doors
    “PVC windows”
    Landscaping
    “tree planting, public open space, planting schedule”
    Groundworks
    “tarmac surfaces, concrete surfaces, kerbs, footpaths”

How we know this

From the Tipperary County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Powerstown

Get alerts for Co. TipperaryFree. We email you when new applications appear.

Free email alerts

Get new Tipperary projects by email

New applications, decisions and site starts in Co. Tipperary. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options