Development Description
upgrades to the existing Roscrea WwTP and storm management system to comprise of the construction of a new inlet chamber (5.2m x 2.5m) and associated ducting, cable draw pits, control panels, realignment of existing boundary wall ground works and the provision of a PV Solar Array (36m2) on the existing sludge dewatering house, all at the existing Roscrea WwTP; decommissioning of 2 no. existing pipe bridges and construction of 4 no. pipe bridges (450mm diameter) across the River Bunow, construction of a retaining wall and ancillary works at Beechwalk; the decommissioning of an existing pipe and the construction of a gravity sewer at Beechwalk (66m); the decommissioning of the Storm Water Overflow, reuse of an existing pipe (14m) and the construction of a gravity sewer (205m) between Beechwalk and Cois Aglish connecting to the existing network; creation of a temporary entrance off the R491 to facilitate access to the proposed temporary construction compound adjacent to the existing Roscrea WwTP and all ancillary and associated temporary works to facilitate the development at the construction stage - A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Map
No coordinates supplied in the public planning feed.