Temporary/event, The N76 R690 and R692 roads in the townlands of Ballaghoge...
Works relating to the Turbine Delivery Route for the consented Knockroe Wind Farm (ACP Ref: 315176). The works will take place in the townlands of Ballaghoge (Ballagroge), Ballycullin, Ballydavid, Ballyduggan, Ballyhomuck, Ballywalter, Cappaghmore, Cappoge, Grangemockler, Gurteen (Bryan), Kilburry East, Kilburry West...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 2 Dec 2025. / Confidence: LowDecision date 2 Dec 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Works relating to the Turbine Delivery Route for the consented Knockroe Wind Farm (ACP Ref: 315176). The works will take place in the townlands of Ballaghoge (Ballagroge), Ballycullin, Ballydavid, Ballyduggan, Ballyhomuck, Ballywalter, Cappaghmore, Cappoge, Grangemockler, Gurteen (Bryan), Kilburry East, Kilburry West, Kilnagranagh, Kilvemnon, Mullinoly and Ninemilehouse, County Tipperary. The proposed development will consist of temporary road widening works, the construction of temporary sections of stoned...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Tipperary County Council
- Exact reference
- 2561016
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event
The public application record identifies temporary/event in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Tipperary planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Works relating to the Turbine Delivery Route for the consented Knockroe Wind Farm (ACP Ref: 315176). The works will take place in the townlands of Ballaghoge (Ballagroge), Ballycullin, Ballydavid, Ballyduggan, Ballyhomuck, Ballywalter, Cappaghmore, Cappoge, Grangemockler, Gurteen (Bryan), Kilburry East, Kilburry West, Kilnagranagh, Kilvemnon, Mullinoly and Ninemilehouse, County Tipperary. The proposed development will consist of temporary road widening works, the construction of temporary sections of stoned tracks and other associated accommodation works at the locations noted below. The works consist of: - Temporary works within GAA grounds adjacent to the R692 road in the townland of Kilburry West to include; temporary removal of a section of the boundary wall and entrance gates; temporary removal of block walls within GAA grounds; temporary removal of scoreboard; pitch grass to be covered with protective Aluminium Trackway mats; installation of temporary Heras fencing and access gates; and all other ancillary temporary accommodation works. All temporary works to be reinstated to their existing condition including reinstatement of existing boundary arrangements and treatments following delivery of turbine components. - Tree trimming at Ballycullin Bridge on the R692 road in the townland of Ballycullin. - Temporary widening of section of the R692 road in the townland of Kilvemnon. Works to include construction of temporary section of stoned track; temporary removal of hedging; installation of temporary Heras fencing and access gates; and all other ancillary temporary accommodation works. All temporary works to be reinstated to their existing condition, including reinstatement of hedging following delivery of turbine components. - Construction of a temporary section of stoned track at the R690 - R692 road junction in the townland of Mullinoly. Works to include removal of boundary wall sections and installation of temporary Heras fencing and access gates; hedge trimming; and all other ancillary temporary accommodation works. All temporary works to be reinstated to their existing condition, including reinstatement of boundary wall following delivery of turbine components. - Construction of a temporary section of stoned track at the R690 road in the townland of Kilvemnon. Works to include trimming and removal of hedges and trees along the field boundary; installation of temporary Heras fencing and access gates; and all other ancillary temporary ac
Application to site progress
-
Applied 9 Oct 2025 2561016
-
Decision Conditional 2 Dec 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2561016
Works relating to the Turbine Delivery Route for the consented Knockroe Wind Farm (ACP Ref: 315176). The works will take place in the townlands of Ballaghoge (Ballagroge), Ballycullin, Ballydavid, Ballyduggan, Ballyhomuck, Ballywalter, Cappaghmore, Cappoge, Grangemockler, Gurteen (Bryan), Kilburry East, Kilburry West, Kilnagranagh, Kilvemnon, Mullinoly and Ninemilehouse, County Tipperary. The proposed development will consist of temporary road widening works, the construction of temporary sections of stoned tracks and other associated accommodation works at the locations noted below. The works consist of: - Temporary works within GAA grounds adjacent to the R692 road in the townland of Kilburry West to include; temporary removal of a section of the boundary wall and entrance gates; temporary removal of block walls within GAA grounds; temporary removal of scoreboard; pitch grass to be covered with protective Aluminium Trackway mats; installation of temporary Heras fencing and access gates; and all other ancillary temporary accommodation works. All temporary works to be reinstated to their existing condition including reinstatement of existing boundary arrangements and treatments following delivery of turbine components. - Tree trimming at Ballycullin Bridge on the R692 road in the townland of Ballycullin. - Temporary widening of section of the R692 road in the townland of Kilvemnon. Works to include construction of temporary section of stoned track; temporary removal of hedging; installation of temporary Heras fencing and access gates; and all other ancillary temporary accommodation works. All temporary works to be reinstated to their existing condition, including reinstatement of hedging following delivery of turbine components. - Construction of a temporary section of stoned track at the R690 - R692 road junction in the townland of Mullinoly. Works to include removal of boundary wall sections and installation of temporary Heras fencing and access gates; hedge trimming; and all other ancillary temporary accommodation works. All temporary works to be reinstated to their existing condition, including reinstatement of boundary wall following delivery of turbine components. - Construction of a temporary section of stoned track at the R690 road in the townland of Kilvemnon. Works to include trimming and removal of hedges and trees along the field boundary; installation of temporary Heras fencing and access gates; and all other ancillary temporary ac
Open official record