Public / civic · Co. Tipperary
Colaiste Dun Iascaigh, Cashel Road, Co. Tipperary
Granted 20 Mar 2026 (final grant issued 23 Apr 2026)
Key facts
- Planning application 2561123 at Colaiste Dun Iascaigh, Cashel Road, Co. Tipperary: All-weather sports facilities to the rear of the school.
- It was received by Tipperary County Council on 7 Nov 2025.
- Status: Granted 20 Mar 2026 (final grant issued 23 Apr 2026).
- Permission was granted on 20 Mar 2026 and the final grant issued on 23 Apr 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Tipperary County Council planning register, checked 2 Jun 2026. Open the council's file
More planning applications in Cashel Road · Planning applications in Co. Tipperary
What and where
All-weather sports facilities to the rear of the school
the construction of all-weather sports facilities to the rear of the school including the following: a) a 3 lane, 400-metre athletic running track, with a 6 lane, 100-metre sprint track, b) an all-weather pitch for soccer and GAA games, c) track and field sports including long jump, high jump, shot put, boules, miniature-golf course, d) a perimeter walkway/running track with low level lighting around the existing amenities, e) flood-lighting to the main all-weather pitch and track and field sports, f) two new paddle courts with flood lighting and associated fencing, g) proposed ball stop netting, h) proposed dugouts, i) ancillary structures such as a small retaining wall between the all-weather pitch and the existing grass pitch, steps, footpaths, fencing and gates. The works include all landscaping, drainage, ancillary works and services
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Cashel Road, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 2561123
Numbers and dates
- Project type
- Public / civic
- Received
- 7 Nov 2025
- Decision to grant
- 20 Mar 2026
- Final grant
- 23 Apr 2026
Timeline
- Application received
- Decision to grant
- Final grant issued
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2561123 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Tipperary County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Explore the area