Energy · Co. Tipperary

Ballynilard, Tipperary, Co. Tipperary

Decision due 17 Dec 2026

Get updates on this application

We'll email you when the council decides, if the decision is appealed, and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660893 at Ballynilard, Co. Tipperary: RED III application for development which comprises the construction…
  • The applicant is Mr Andrew Kiely and Nephin Renewable Gas - Ballynilard Ltd. The agent is John Spain.
  • It was received by Tipperary County Council on 11 Sep 2026.
  • Status: Decision due 17 Dec 2026.
  • The council's decision is due on 17 Dec 2026. Building work can only follow a grant of permission.

Source: the Tipperary County Council planning register, checked 19 Nov 2026. Open the council's file

More planning applications in Ballynilard · Planning applications in Co. Tipperary

What and where

RED III application for development which comprises the construction…

RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: • Construction of 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the main site area. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height), and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A liquid feed tank (c. 4m in height), a pump house (with a height of c. 2.6m and GFA of 14 sq.m), and a pump skid (c. 0.8m in height), located to the southwest of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • A pump house (with a height of c. 2.6m and GFA of 21 sq.m), a fuel storage tank (c. 1.6m in height), and a backup generator (c. 2.3m in height), located adjacent to the nutrient recovery building. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • construction of an emergency biogas flare (c. 11.3m in height), 2 no. biogas treatment skids (with an overall height of c. 4.1m), 2 no. biogas compression structures (with a height of c. 2.6m), a biogas upgrading module (with a maximum height of c. 4.6m and a GFA of c. 28 sq.m), a combined heat and power unit and panel room (with a height of c. 10m to top of flue), a biomethane boiler (c. 5.6m in height to flue stack), and 2 no. propane tanks (c. 1.3m in height), located to within the western section of the site. • Construction of an ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by Gas Networks Ireland), a GNI / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site. • Construction of a two-storey office and administration building (with an overall height of c. 8.7m and a GFA of c. 305 sq.m), located within the southeastern section of the site. • Associated works including parking (6 no. standard, 2 no. EV, and 1 no. accessible parking spaces; and bike storage), access arrangements (including new access and entrance road to the site from the adjacent road to the south, with setting back of boundaries along the R662), a weighbridge, provision of solar panels (roofed mounted solar arrays), wastewater treatment equipment, attenuation pond in the northern portion of the site and associated surface water outfall to the north of the main site area, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) accompanies the planning application An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development

Location
Ballynilard, Co. Tipperary Map
Planning reference
2660893
Application type
Permission
Applicant
Mr Andrew Kiely and Nephin Renewable Gas - Ballynilard Ltd

Numbers and dates

Floor area
1,964 m²
Project type
Energy
Received
11 Sep 2026
Decision due
17 Dec 2026

Outlook

What happens next

The council's decision is due on 17 Dec 2026. Building work can only follow a grant of permission.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660893 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Tipperary County Council planning register, checked 19 Nov 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Ballynilard

Get alerts for BallynilardFree. We email you when new applications appear.

Free email alerts

Get new Ballynilard projects by email

New applications, decisions and site starts in Ballynilard, Co. Tipperary. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options