- Planning application 2560625 at Within The Townlands of Blackknock and Adamstown, Kilmeaden, Co. Waterford.: Development of the former cheese factory site and adjoining lands…
- The applicant is Crag Rathnew Dc Ltd and Kent Homes Ltd. The agent is John Spain.
- It was received by Waterford City and County Council on 8 Sep 2025.
- Status: Under appeal since 11 Nov 2026 (Refused 15 Oct 2026 by the council).
- The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.
Source: the Waterford City and County Council planning register, checked 11 Nov 2026. Open the council's file
More planning applications in Kilmeaden · Planning applications in Co. Waterford
What and where
Development of the former cheese factory site and adjoining lands…
the proposed development comprises the development of the former cheese factory site and adjoining lands to provide for a mixed use village centre, technology park, and renewable energy development on a total site area of 108.79 hectares. The proposed development will consist of the following: The demolition of 2 no. existing single storey outbuildings and 1 no. AGI building (126 sq.m. GFA in total) in the northern portion of the site, along with all site clearance and enabling works required to facilitate the proposed development. In the northern portion of the site the construction of a new village centre comprising the following: • A two-storey mixed-use building (fronting onto the R680) comprising a gym, café, health centre, pharmacy, and office space, with a total GFA of c. 1,856 sq.m. (c. 10.3m in height). • A two-storey community centre (with a GFA of c. 847 sq.m. and c. 11m in height). • 2 no. three-storey apartment buildings (Apartment Blocks A and B) comprising 48 no. units in total, including 6 no. 1 bedroom apartments and 42 no. 2 bedroom apartments. The apartment buildings have a combined gross floor area (GFA) of c. 5,374 sq.m. and the buildings are c. 14.3m in height. Each of the apartment buildings include private open space in the form of patios and balconies, along with bin stores, communal open space, and access arrangements. • A two-storey supermarket (including off-licence) comprising a GFA of c. 1,605 sq.m. (c. 1,514 sq. m at ground floor level and c. 91 sq. m. at first floor level) with a height of c. 8.2m. A bring bank will be provided to the south of the supermarket. • A two-storey childcare facility building with a GFA of c. 1,345 sq.m. (c. 10m in height), along with adjacent outdoor play area. • A Multi-Use Games Area (MUGA), located adjacent to Apartment Block A and the childcare facility. • A two-storey commercial / office building comprising 4 no. commercial units, (with a GFA of c. 614 sq.m. and c. 10.1m in height). • 2 no. two storey warehouse buildings (each with a GFA of c. 562 sq. m. including ancillary office space and staff welfare facilities, with an overall height of c. 10m). • A District Heating Plant Room (with a GFA of c. 14 sq. m. and c. 3.8m in height) to provide district heating from the technology park to the village center, bin stores, lighting, access arrangements, and the provision of areas of public realm and open recreational spaces including a new village square. In the central portion of the site the construction of a new technology park comprising the following: • 3 no. two storey (with two mezzanine level), information and communication technology (ICT) facility buildings, each with a GFA of c. 24,033 sq.m (c. 72,099 sq.m GFA in total), and with a height (to parapet level) of c. 19.8m and a maximum flue height of c. 25m. • Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities, emergency generators and flues, and plant at roof level. External plant rooms (with an overall height of c. 3.7m) and modular water tanks will be provided adjacent to each of the ICT facility buildings. • An energy center building (with a GFA of c. 3,720 sq.m and with a parapet height of c. 13.8m) including 16 no. gas powered turbines, associated flues (with a height of c. 29.8m), associated ancillary containers and tanks, backup fuel pumps and tanks, fire tanks (with a height of c. 12.8m) and pump house, MCC control room (with a GFA of c. 41 sq.m.), welfare and storage facilities (with a GFA c. 60 sq.m.), a three storey control room building with basement (with a GFA of c. c. 5,343 sq.m. and an overall height of c. 18.9m), a single storey with basement MV building (with a GFA of c. 1,246 sq.m. and an overall height of c. 5.3m), step up and step down transformers, and 7 no. black start generators. • 2 no. warehouses with ancillary office space, with a GFA of c.3,121 sq.m. each, and with a height of c. 14.2 metres • A gas above ground installation (AGI) and pressure regulating and metering station (PRMS) compound, (comprising an AGI Building, Boiler House Kiosk, E&I Kiosk, Control Room and Skid House) with a combined GFA of c. 202 sq.m.), 3 no. ICTpumphouses (c. 40 sq.m. each), and two single storey guardhouses (each with a GFA of c.29 sq.m). In the southern portion of the site the construction of a of a solar farm with PV arrays consisting of 43,056 PV panels mounted on concrete footings, 3 no. single storey transformer cabins (with a combined GFA of c. 54.6 sq.m), a battery energy storage system (BESS) compound with an area of c. 6,682 sq.m.(comprising modular battery units within a fenced compound, along with associated electrical equipment and transformers), internal access tracks, and security fencing. In the western portion of the site the construction of a new vehicular access (including a bridge over an existing watercourse) to the Technology Park to be provided between the R680 and the R681. The primary vehicular access to the village center will be facilitated via the existing access from the local road to the north. Pedestrian and cycling access to the village center will be facilitated via both the local road and R680. Access to the Solar farm is provided via the local road to the north of the solar farm. Provision of areas of public open space and a walking/cycling route which extends from the village center to the southeast of the Technology Park. The development provides 441 no. car parking spaces and 267 no. cycle spaces. The development includes provision of landscaping and planting throughout, PV panel zones at roof level, boundary treatments, signage zones, site lighting, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems, and all ancillary works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Kilmeaden, Co. Waterford Map
- Planning reference
- 2560625
- Applicant
- Crag Rathnew Dc Ltd and Kent Homes Ltd
- Agent
- John Spain
Numbers and dates
- Received
- 8 Sep 2025
- Council decision
- 15 Oct 2026
- Appeal lodged
- 11 Nov 2026
Timeline
- Application received
- Refused by the council
- Appeal lodged
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2560625 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealUnder appeal · 502469 / 11 Nov 2026View the appeal record