Carrigtwohill, Cork
Installation and final construction of a modular off site manufactured cleanroom building onto prepared reinforced concrete foundations. The foundations are completed under a separate commencement notice.
Co. Cork
26 planning applications · 214 site starts · latest 16 Nov 2026
Page 2 of 3 · newest first
Installation and final construction of a modular off site manufactured cleanroom building onto prepared reinforced concrete foundations. The foundations are completed under a separate commencement notice.
To demolish rear dwelling extension, derelict outbuildings at the side/rear and to remove the side garden wall, to alter the existing front part of dwelling house (cottage) and to construct a new single...
to demolish part of the existing timber frame educational complex building and to erect a new extension to the existing building consisting of the following: a) new 2 storey office block and plant room...
The construction of a new single storey electrical building and a new 20m high stack to replace an existing 14.6m high stack, with associated plant, equipment and site works
Two storey extension with balcony and first floor external terrace area and staircase, a connecting single storey link extension to an existing single storey dwelling, including alterations to the...
In Carrigtwohill
In Carrigtwohill
Dated since 1 Nov
Newest record date
132 of 240 · then Extension, Change of use
Earlier records
3 storey, 1000 pupil, post primary school building (Roll No: RN76333G), with physical education hall, 3 classroom SNU, support teaching spaces, external material storage room for wood and metal work...
Construction of a single storey external store and bin store
Construction of a single storey Domestic Garage at Upper Killacloyne, Carrigtwohill.
Construction of 2-storey extension linking the existing administration and packaging buildings
Opt Out Erection of a new single storey detached dwelling of masonry construction, a new site entrance and all associated site works including a new septic tank system and percolation area at Blake...
Construction of a single-storey domestic garage
Construction of 22 No. Two Storey Dwellings at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. (House Nos 1-22 The Avenue)
Construction of 2-storey detached dwelling
Opt Out- Construction of a dwelling house
Construction of 9 No. Two Storey Dwellings at 1-9 The Drive, Elmbury, Carrigtwohill, Co. Cork
Community dressing rooms at All-Weather pitch
The internal fit-out and site works for the substantially completed apartment blocks located at Castlelake, Carrigtwohill, Co. Cork. There are 95 apartments in total located in two buildings and a total...
Construction of dwelling at Ballynakilla, Carrigtwohill, Co. Cork.
Merck Utilities Building Construction of a utilities building to house 2 chiller units and associated infrastructure.
To construct a single storey sprinkler pump house, and two associated sprinkler tanks to the south of the existing production facility, including all associated external site works.
The development comprises the construction of a new prefabricated structure measuring approximately 270m/sq to house one science room, one preparation area (with a chemical store), two classrooms, a WC...
To construct a covered patio area and a two storey extension to the rear of existing dwelling house, internal alterations and all associated site works.
re-model existing dwelling and construct single-storey extension with new site entrance and domestic effluent treatment plant
The construction of new dwellinghouse, new entrance, proprietary treatment unit and polishing filter together with all other ancillary site works.
Construction of ESB substation. The ESB substation including an adjacent switchroom will be 3.375m high, 7,650m long and 4.360m wide (change of location from that previously permitted under Pl.Reg.20/4090)
New 30sq/m single storey deionised water plant services building adjacent to existing industrial facility.
Construction of 20 No. Two Storey Dwellings at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. (House No’s 1-20 The Square)
The projects invloves the provision of additional temporary post-primary school accomodation by way of construction of prefabricated buildings on site (split over 3 phases) on a defined site area with...
To construct a new storey and half type dwelling house, demolish existing domestic shed, construct new gated entrance and the existing memorial cross to be moved to the western boundary wall of the...
Installation of modular building comprising 7 No. Classrooms and all ancillary works
Construction of a 2-storey side extension to existing house including modifications to the elevations of the existing building and associated site works.
78m2 2-storey plant- room extension to existing industrial production building.
The development will consist of: 1. A single storey laboratory building to include plant and equipment area, roof top plant platform, office area, meeting rooms, canteen and kitchen, staff toilets...
The construction of 1 no. temporary 80 square metre single- storey portacabin modular classroom unit and all other related ancillary ancillary site works
Construct a two storey dwellinghous e, domestic vehicular entrance, treatment unit and all associated works at Poulaniska Carrigtwohill County Cork
Single storey extension to side and rear as well as new front porch on existing bungalow and all associated site development works.
Construct a single story dwellinghouse, vehicular enterance, wastewater treatment system and all associated site works
To construct a new dwelling
Rear extension to existing dwellinghouse
Construction of a new dwelling house, wastewater treatment system and all associated site works at Killacloyne
Construction of 19 No. Two Storey Dwellings (No’s. 27-33(a) and 37-48) at Cluain Cairn, Station Road, Carrigtwohill, Co. Cork.
To construct a new single-storey extension of total area 750sqm to the western side of the existing main building containing a new high-speed filling line to replace the existing filling line on the...
Construction of ground & first floor extension to side (west) of dwelling, alterations to rear of dwelling and all associated site works.
The construction of an Electrical Room Building and transformer enclosure and associated site works.
Construction of a single storey extension (55.25 sq.m) to the rear of the existing building to extend the store room for the shop
2 no. blocks of temporary single storey pre- fabricated buildings. Block No. 1 containing Science room & Preparation Room, Block No. 2 Containing 3 No. General Classrooms and toilet accommodation and...
Proposed to constructed 2 no. Prefabricated classrooms as part of Phase 1. (Application was granted for - 2 year permission for 4 no. temporary classrooms (320msq), Comprising of 1 no. block of 3...
Construction of an Extension to the Existing Factory for the Storage of Pallets
The construction of a booster pump house required as part of the water distribution infrastructure on site.
Attic conversion with two dormer windows to front pitch of dwelling.
Extend family resource centre with new administration office at first floor and extended office at second floor along with oriel bay to elevation and wall external signage
extension to dwelling house in Gurranes Carrigtwohill
Construction of a new two storey bin washer centre extension to the north elevation of the existing manufacturing building. Works consist of a new bin washer centre at ground floor with walk-on-ceiling...
Extension to provide new multi-storey production area at Merck Millipore, Tullagreen, Carrigtwohill, Co. Cork
Construct a Dwelling House
single storey building to be used as interpretative centre
Opt Out - Construction of a dwelling house
Construction of a dressing room/clubhouse building consisting of 6 no. dressing rooms, meeting rooms, club rooms, car-parking and ancillary site works.
Construction of Dwelling
To remove existing portacabins currently being used as office/shop units and 2) To construct a new two storey office/shop unit
Construction of a detached two storey dwelling, modifications to existing driveway and all associated site works.
Construction of a first floor extension to rear of existing dwellinghouse and permission for an attached single story granny flat.
Single storey extension to existing production plant, extension to the existing canteen, internal modifications, the removal of existing temporary buildings, complete with external stores and ancillary...
To construct a dwelling house, septic tank, domestic vehicular entrance, bored well and all associated site works
The construction of 2 no. temporary classrooms, measuring 156 square metre in modular portacabin single-storey form and all ancillary site works at Scoil Mhuire Naofa, Carrigtwohill, Co. Cork.
Construction of 2no. single storey extensions and internal modifications to the existing retail floor
Construct a new two storey annex with fire escape stairs to the western elevation of an existing manufacturing building, together with the development of an access road for a relocated Intermediate Bulk...
Fit-Out of 2nd Floor Level of existing building to accommodate a Primary Healthcare Centre for HSE and General Practitioners (GP's) and associated mechanical and electrical services plant.
Refurbishment of existing house.
erection of creche and associated site development works
Construct a bungalow and detached garage with waste water treatment unit and associated site works. 2. Install a waste water treatment unit in lieu of existing septic tank serving adjacent dwelling
To construct a new dwelling, internal access road and all site ancillary works
Proposed material alteration and sub-Division of the existing delivery area, with resulting partial change of use to provide additional office accommodation and reduced delivery handling area at Stryker...
Construction of 2-storey dwellinghouse, vehicular entrance and all assocaited site works
Construction of two dwellings and two garages at Terrysland, Carrigtwohill
OPT OUT - Construction of new dwelling and all associated site works in Ballintubber, Carrigtwohill
Single storey, ground floor extension to provide workshop at Stryker Tullagreen.
Kenneally Regina new house and garage
Construction of 25 No. Two Storey Dwellings at 1-25 Cois Cille, Church Road, Carrigtwohill, Co. Cork
4 Temporary Classrooms(circa 304 sq.m.) 2.4 high post & Mesh Fenced nclosure, associated drainage to include connections to existing on site foul & surface water sewers, revised drop off area adjoining...
Construction of a dwelling house and all associated site works @ Ballintubbrid East, Carrigtwohill, Co. Cork for -with Opt Out Declaration.
Internal Alterations to existing Unit @ 9 Barryscourt Business Park, Carrigtwohill, Co. Cork
Construction of dwelling house, domestic garage and associated site works.
Opt Out -Demolition of existing garage, alterations and extension to existing dwelling and construction of new detached garage and all associated site works at Marble Hill, Carrigane, Carrigtwohill.
Construction of 2 store retail unit (charity shop) including retail, storage, sanitary and staff accommodation and associated site works at Main Street Carrigtohill
Partial demolition of existing dwelling, construction of a 2 storey side/single storey rear extension with minor alterations to existing dwelling and all associated site works at 17, Castleclose...
Construction of dwelling and garage at Fahydorgan, Carrigtwohill, Co. Cork.
Demolish an existing 2 storey projection to the side of existing dwelling house and construct a two storey extension to rear(west facing) and side (south facing) of existing dwelling house, installation...
Single storey extension to Fota Island Golf Clubhouse
The building is an existing large Industrial building with an associated two-storey Canteen and Office area. The proposed works consist of an extension to the canteen and offices area.
Creon DR - Construction of a Four Storey Extension to existing Manufacturing Facility at Abbvie Carrigtwohill, Co Cork.
Construction of a two storey new Quality Control (QC) laboratory adjacent to the existing administration building at its existing facility
Construction of a detached two storey dwelling along with associated road entrance and driveway. Detached domestic garage, site and ancillary works.
Construction of a carport with detached domestic garage to rear of existing dwelling house @ Carhoo, Carrigtwohill, Co. Cork for Jean- Michel & Michelle Rubillon.
Construction of a new innovation extension building on two floors of total area 1277 square metres to the eastern side of the existing main building, with a new link corridor to existing ground floor...
to construct a new dwelling, treatment unit and associated site works (opt out)
Extension to side and rear of house
Extension to existing “All Aboard” Creche facility comprising 90sq.m building, relocation of outdoor play area, and ancillary roads and services connection works. Development is within the cartilage of...
Construction of 29 No. Two Storey Dwellings at 40-68 An Faill, Cúl Ard, Terry's Land, Carrigtwohill, Co. Cork
Installation of the final 2 of 4 temporary classrooms & associated site works.
Council
Nearby
Explore