Dublin Airport, Dublin
Proposed Material Alterations to the existing Terminal Operations Centre for relocation of APOC during L40 & L50 works, to include expansion of existing office space and staff facilities
Co. Dublin
2 planning applications · 35 site starts · latest 11 Sep 2026
Source: each council's planning register. Every record below links to its own page and to the council's file.
Newest first
Proposed Material Alterations to the existing Terminal Operations Centre for relocation of APOC during L40 & L50 works, to include expansion of existing office space and staff facilities
Compliance submission for permission F24A/0965E. Condition 2b of planning permission granted F24A/0965E
The provision of apron bus access facilities at Terminal 2, comprising the construction of a vertical circulation core (10.95m high) to the south of Terminal 2 (airside), linking to Terminal 2 via a...
Proposed Material Alterations at L10 of the Check-in Building At Terminal 2 Dublin Airport, Dublin.
Proposed construction of the North Apron Line Maintainence Centre (NALMC) building to be located in the North Apron area airside at Dublin Airport
In Dublin Airport
In Dublin Airport
Dated since 1 Nov
Newest record date
16 of 37 · then New build, Change of use
Earlier records
A mural (52sqm) for the purposes of the display of public art, on the rear of the Dublin Airport welcome wall including no.14 lights at Dublin Airport and all associated site development works.
Revisions to the L40 Office fitout of the previously approved Fire Safety Certificate (Reg. Ref. No. FSC-RV, 3004164 and Reg. Ref. No. FSC/286/23) At BCB Building, Dublin Airport, Co. Dublin.
Proposed material alterations for T1X Street Kitchen at L20 (Departures Level), Terminal 1 (T1X), Dublin Airport.
Proposed material alterations of the previously approved landside food and beverage unit FB-02 (to be known as Fitzgerald's Bar) at Dublin Airport, L20 Arrivals, Terminal 2, Dublin.
: In accordance with Section 34B of the Planning and Development Act
Proposed material alterations of the previously approved (FSC384/23) FB-01 & 02 food and beverage units at L20 (Departures Level), Terminal 1 (T1X), Dublin Airport.
The Proposed Material Alteration of the Previously Approved FSC227/13 Associated with the Terminal 1 Enhancement Works
Renovation and fit-out of commercial kitchen at FB06 (Market 53) at Level 35, Terminal 2, IDL, Dublin Airport.
1. Fit out of ground floor level unit as restaurant/café to existing unit at Building A6, Dublin Airport Central, Dublin Airport, Co. Dublin.
Installation of Commercial Kitchen and Plantroom Works at Terminal 2, Dublin Airport
Erection of a new security gatepost, and all associated infrastructure including access to Castlemoate Road and modifications to the CPSRA boundary fence (referred to as Goods Entrance 1B); and the...
Proposed Material alteration and fit out of units 12 and 13, Level 30, Terminal 2
Alterations to retail units R3001, R3017 & R3054 to provide for reconfigured duty free and retail area at L30, Terminal 2, Dublin Airport.
Material alterations to existing unit on first floor of Pier 300, Terminal 1, Dublin Airport.
Construction of a new By Pass Corridor from the Security Screening area to the Departures Concourse. Level 30, Terminal 2, Dublin Airport.
AMT Coffee Bar fitout works to F&B Unit 1 Arrivals Terminal 1 Dublin Airport, Co.Dublin.
Construction of new BOH corridor, reduction in floor area of several retail units and amalgamation of 4 existing retail units in one larger unit.
Construction of a new 1 storey Electrical Substation Building with a total floor area of 93 sqm and height of 3.6m subdivided into 3 rooms comprising of an ESB sub-station, a Customer Switch Room and a...
Installation of seven number single storey prefabricated refrigerated units and ancillary accommodation works at Gate Gourmet Ireland, South apron, Dublin Airport
The construction of new hangar and offices building at Dublin Airport for CHC SAR Operations
Removal of portacabin, diversion of existing utilities and associated civil engineering works
Construction of a new 1 storey office building with a total floor area of 360sqm.
Material alterations of existing unit comprising of new internal fit out at Leopold Cafe, First Floor, Pier 2, Terminal 1, Dublin Airport.
It is proposed to carry out material alterations to the existing Pier 4 and construct a three storey extension to the Pier to aid with passenger circulation. The material alterations within the existing...
It is proposed to construct an extension to the existing Pier 1. The extension will consist of a ground floor which will be used as a departures area. The extension also consists of 4 Roof Top Plant...
The construction of a temporary office for the Stand Allocation Unit in the OCTB building.
Material Alterations to “Starbucks” Coffee Shop at T1X, Dublin Airport
Reconfiguration and Fit-out of the existing Evacuation Area N (Level 10 - Back of House Areas) within Pier 4 (previously known as Pier E) of Terminal 2 as a DAA Executive Lounge.
Glazed link passage
Wash Rooms – Airside/work site 1 (226 sq. meters) & Landside/work site 2 (248 sq.meters) There is a requirement to carry out an upgrade of the toilet facilities in Terminal 1. The focus of this project...
change of use to an Aer Lingus arrivals freshen-up facility and reconfiguration of existing baggage store area at level 20, Terminal 2, Dublin Airport
Creation of new storeroom in existing fallow space in Terminal 1, Departures level.