Material-Alteration / PB-35522385335123773
Dublin 4, Dublin - Commencement Notice
Modification of existing office fitout to adapt to new tenant requirements.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Board preview from filters / 02 Oct 2026
This board preview uses server-side filters and a 25-row cap. Use the inline board packet preview on Project Leads for the canonical shown-card export.
Document-verified details: 0 of 25 leads. Preview and PDF use the same structured planning-document fields.
Board trail
Browser-local board history for repeat review. Saved links keep the current filter shape.
No recent boards on this browser yet.
Board basis
Board PDF includes a board receipt, decision register, source trail, lead rows and source-rule footer. Estimated construction values are our estimates from floor area or stated homes and the project type, using rates from published Irish construction cost guides, January 2026. They cover building works only and are not stated figures.
Material-Alteration / PB-35522385335123773
Modification of existing office fitout to adapt to new tenant requirements.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Material-Change-Of-Use / PB-29924480477709357
Refurb, floor, kitchen units patch roof
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-15692385175756017
Conversion of existing attic space comprising of modification of existing roof structure; New gable window; New access stairs; 2no. roof windows to the front and flat roof dormer to the rear.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-50471702059212253
demolition of existing conservatory and construction of flat roof extension and internal alterations and associated upgrade works
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
New-Building-Material-Alteration / PB-57386703366631669
Construction of a new 5-storey over basement library building of approximately 6,100m² (excluding roof plant areas) to the rear of Nos. 23-28 Parnell Square North, Dublin 1, providing library, cultural, exhibition, learning, lecture, café and ancillary accommodation. The works include a direct co...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
New-Building / PB-15241956410771882
Construction of 58 houses of 3-storeys in height, including 36 no. 3-bed townhouses and 22 no. 4-bed houses at Ashwood Farm, Glenamuck, Carrickmines, Dublin 18
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
New-Building / PB-19400148167558812
Development of a new music theatre and school within the Nord Anglia International School Campus.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-20515243726341539
Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window, new access stairs; 2no. roof windows to the front and flat roof dormer to the rear.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-4095202310087520
The construction of a new attic level conversion and dormer extension to include alterations to rear and side elevation of existing dwelling, with internal alterations to facilitate the proposed attic conversion, and the provision of 2no. new rooflights to front of existing dwelling.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-2024055518913126
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Material-Alteration / PB-41785523361277553
The renovation of and alterations to No 61 Kincora Road, Clontarf, Dublin 3
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-56606869927822269
The demolition of the existing garage to the side of the existing house (approx 43sqm), demolition of the part single and part double storey structure to rear (approx 73sqm), construction of double storey side extension with pitched roof (approx 40sqm on ground floor and 39sqm on first floor) and...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-36370180629023311
The demolition of first floor side structure (approx. 8sqm) and associated roof, the demolition of rear shed (approx. 7sqm), the construction of a part single, part double storey extension to the side and rear with part pitched, part flat roof (total floor area of ground and first floor extension...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-17970484150984481
The removal of the existing single-storey shed along the west side boundary and the removal of the two-storey west side return extension; construction of single-storey split level flat roof extension attached to the west side of the dwelling and a separate single-storey flat roof extension to the...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-56894923688567355
An attic conversion for storage, raising the side gable to form a pitched roof, adding a side gable window, a dormer roof to the rear, and all ancillary works necessary to facilitate the development.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-38247067126103182
Conversion of the attic space with three dormer windows to the front roof slope and one dormer to the rear of the house.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-33790137162038300
Demolish existing chimney stack to first floor Ceiling: remove existing hipped tiled roof and extend the existing ridge tiles to form new Dutch type roof structure: build part new structure section to side gable up to new soffit level with high level window: new dormer roof structure to existing...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-23290883533093083
Alteration and refurbishment of existing single-storey domestic cottage together with single storey extension to the rear
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-20126505358497536
First-floor extension to the front and side, and a two-storey extension to the rear and side; installation of a new front-facing window at first-floor level; and new Velux rooflights to the front and side roof slopes.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-11981793303853079
The development will consist of: A) The removal of 2 No. attached single storey structures to the rear of property. B) The construction of a proposed single storey flat roof extension to the rear of the property with an associated roof light. C) The addition of a new pitched roof dormer to the we...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
New-Building / PB-2295131490319267
New single storey 165.4 sq. m. Dwelling and all associated external works.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-55182420366554885
The development shall consist of the conversion and change of a single story attached garage into habitable accommodation (family room), including the removal of the existing garage door and the replacement of it by a window, the building of a single story filled extension on the front of the hou...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-43222686066475643
The proposed development will consist of the construction of a first-floor extension above the existing single-storey side structure (formerly a garage) to provide additional accommodation in the form of a bedroom. The development will include external finishes to match the existing dwelling, inc...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-30252277101203737
The proposed development comprises the demolition and reconfiguration of the existing entrance arrangement and the construction of a new front porch, along with the closing of the existing vehicular entrance along the southern site boundary and creation of a new vehicular entrance on the western...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Material-Change-Of-Use / PB-34608670714671064
Ex Kitchen to Commercial Kitchen change of use.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.