Project type / Updated 17 Nov 2026

Solar and Energy Projects planning and construction leads.

Solar PV, energy, grid and renewable project leads from Irish public planning records.

Includes
Energy, Infrastructure
Counties with records
8
What is counted
Planning records in the current index
Records indexed 856

Planning applications, commencement notices and appeals

Active applications 844

Not refused or withdrawn

Tenders Limited data

Tenders tagged with this project type

Commencement notices 10

Linked to these planning records

Appeals 0

Cases at An Coimisiún Pleanála

Estimated units 6

Where the application states them

Floor area 1,078

Where the application states it

With an estimated value 0

Records with our construction value estimate

Newest first

Latest planning records: Solar and Energy Projects

See all in Project leads
Project type: Solar and Energy Projects
Rathcoole, Dublin

Block G, Greenogue Logistics Park, Rathcoole, Dublin

South Dublin County Council / Ref SD26A/0215W

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Rathcoole, Dublin
Units / floor
33,037 m² (floor estimated)
Applicant
Nocsy 6 Ltd
Agent
Con McCarthy
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanical
Review recordGranted / South Dublin County Council
Status / decision
Granted / 29 Oct 2026
Authority / ref
South Dublin County Council / SD26A/0215W
Development facts
Infrastructure / 33,037 m² (floor estimated)
Likely packages
Compliance, Electrical, Groundworks, Health & Safety, Main contractor
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 29 Oct 2026.

Source descriptionAlterations to an existing granted planning application (Reg. Ref. SD25A/0259W) for a Proposed Warehouse Development with Ancillary Office & Staff Facilities. The subject alterations for which Planning is now sought for are as follows: Addition of an integrated 2-storey ancillary office block to the north-eastern corner of the building and relocation of the previously granted HGV dock office block, plus associated elevational alterations resulting in ground floor plan: change of use of 299 m² of Warehouse Area to 32 m² of Ancillary Office area and 267 m² of Staff Facilities Area, resulting in 32,105 m² of Warehouse Area. First floor plan: Addition of 255 m² of Ancillary Office Area and 36 m² of Staff Facilities Area. Reduction of 5No. dock leveller doors & 1No. level entry goods door due to the above-mentioned alterations and addition of 2No. disabled carparking spaces to facilitate the additional office area. Addition of an on-site ESB Substation with a total area of 43 m². All other details will remain as per the granted application Reg. Ref. SD25A/0259W.

EnergyH&S triggerInfrastructureVacant / reuse signal

Source: South Dublin County Council public planning register / official file linked

Dublin 15, Dublin

Unit 15c, Blanchardstown Corporate Park 1, Dublin 15, D15 YX4A

Fingal County Council / Ref FW26A/0336E

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Dublin 15, Dublin
Units / floor
1,252 m² (floor estimated)
Applicant
Channor Ltd
Agent
CBRE Advisory (IRL) Ltd
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & SafetyMain contractor
Review recordGranted / Fingal County Council
Status / decision
Granted / 22 Oct 2026
Authority / ref
Fingal County Council / FW26A/0336E
Development facts
Infrastructure / 1,252 m² (floor estimated)
Likely packages
Compliance, Electrical, Fire Safety, Groundworks, Health & Safety
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 22 Oct 2026.

Source descriptionThe development will consist of: (1) Demolition of the existing two-storey petrol station building (465 sq.m. GFA). (2) Construction of a relocated two-storey petrol station building (787 sq.m. GFA), comprising retail use, café/restaurant use, associated food preparation and storage areas, customer welfare facilities, and circulation space at ground floor level (c.591 sq.m GFA), together with staff offices, staff welfare facilities, and internal and external screened plant areas at first-floor level (c.196 sq.m internal GFA; c.151 sq.m. external area). The building will also include a sedum roof at roof level. (3) Extension and reconfiguration of the existing forecourt and canopy area, including an increase from 4 no. double-sided pump islands to 6 no. double-sided pump islands, together with the installation of roof-mounted solar photovoltaic (PV) panels on the canopy. (4) Reconfiguration of the existing car wash facility. (5) Provision of signage, including building and forecourt-mounted signage and a replacement totem sign. (6) Reconfiguration of the existing car parking layout, including the provision of standard parking spaces, electric vehicle (EV) charging spaces, accessible parking spaces, car service spaces, and motorbike parking spaces. (7) Provision of cycle parking spaces. (8) Improvements to the existing vehicular access and egress points, enhancement of the boundary footpath to the north and west, and the provision of a new pedestrian entrance on to Corduff Road. (9) Provision of a substation, site lighting, bin area, hard and soft landscaping, boundary treatments, and Sustainable Drainage Systems (SuDS) measures. (10) All associated site development and services works on a site of c.0.41 ha.

EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Fingal County Council public planning register / official file linked

Clondalkin, Dublin

The existing Grange Castle 110kV Substation, Grange Castle Business Park, Clondalkin, Co. Dublin

South Dublin County Council / Ref SD26A/0195W

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Clondalkin, Dublin
Units / floor
1,260 m² (floor estimated)
Applicant
Electricity Supply Board (ESB
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanical
Review recordGranted / South Dublin County Council
Status / decision
Granted / 7 Oct 2026
Authority / ref
South Dublin County Council / SD26A/0195W
Development facts
Infrastructure / 1,260 m² (floor estimated)
Likely packages
Compliance, Electrical, Groundworks, Health & Safety, Main contractor
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 7 Oct 2026.

Source descriptionPhysical extension of c. 1260sq.m. to the existing electricity substation compound and will comprise of an extension of the existing 110kV busbar from bay H18 to create a new 110kV line bay H20, including the installation of new electrical equipment; fencing and all other ancillary development works to facilitate the proposed development.

EnergyH&S triggerInfrastructure

Source: South Dublin County Council public planning register / official file linked

Mullingar, Westmeath

Mullingar (Ardmore) Business & Technology Park, Marlinstown, Ardmore, Mullingar, Co. Westmeath

Westmeath County Council / Ref 2660324

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Mullingar, Westmeath
Units / floor
2,500 m² (floor estimated)
Applicant
Westmeath Enterprise & Innovation Designated Activity Company
Agent
Catherine Norris
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanical
Review recordGranted / Westmeath County Council
Status / decision
Granted / 9 Nov 2026
Authority / ref
Westmeath County Council / 2660324
Development facts
Infrastructure / 2,500 m² (floor estimated)
Likely packages
Compliance, Electrical, Groundworks, Health & Safety, Main contractor
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 9 Nov 2026.

Source descriptiondevelopment at the site at Ardmore Business & Technology Park. The site is c. 1.307 hectares in size. It is made up of greenfield lands together with sections of existing road, footpath and cycleway. It is bound to the north, east and west by estate roads within Mullingar Business Park (with access from the N52), and to the south by an existing hedgerow. The development will consist of: [1] The construction of an Advanced Building Solution (ABS) building ranging from one to three storeys (6.2 meters (m) to 14.2 m in height), with a gross floor area of 2,500 square meters (sq. m) to accommodate light industrial / manufacturing and office uses. The building will comprise: (a) A three-storey reception and support office block (12.7 m to 14.2 m in height, 700 sq. m in area) providing covered entrance, reception, administration, staff welfare facilities, ancillary office space and plant rooms; (b) A light industrial / manufacturing production space (10 m clear internal height, 12.7 m to 14 m externally, 1,725 sq. m in area); (c) A single-storey services block (6.2 m in height, 75 sq. m in area) accommodating a substation, switchroom and waste storage area, together with an associated external services yard; and (d) The provision of c. 300 sq. m of photovoltaic panels at roof level. [2] The modification of two existing vehicular access points to provide one point of vehicular and pedestrian access and one point of articulated lorry access; the creation of a new shared pedestrian / cycle entrance point and path. [3] The construction of 41 no. car parking spaces (including 3 no. accessible spaces and 7 no. EV charging spaces) and 42 no. bicycle parking spaces (6 no. Sheffield bicycle stands and 15 no. bicycle stands under shelters, each stand accommodating 2 no. bicycles). [4] The provision of a new uncontrolled pedestrian and cycle crossing in the Mullingar Business Park Estate Road and the northern part of the site, together with associated vehicular and pedestrian signage and ancillary works. [5] All associated and ancillary site development works, site and landscape clearance, the installation of hard and soft landscape planting; drainage infrastructure; fencing and boundary treatments; building, vehicular and pedestrian signage; utilities and site services; and all associated site works

EnergyH&S triggerInfrastructure

Source: Westmeath County Council public planning register / official file linked

(referred To As A Former Laun, Dublin

27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure, (referred to as a former laun

Dublin City Council / Ref WEB2302/26

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

Location
(referred To As A Former Laun, Dublin
Units / floor
15,380 m² (floor estimated)
Applicant
TC Fumbally Properties Ltd
Agent
Paul Turley
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & SafetyMain contractor
Review recordGranted / Dublin City Council
Status / decision
Granted / 21 Jul 2026
Authority / ref
Dublin City Council / WEB2302/26
Development facts
Infrastructure / 15,380 m² (floor estimated)
Likely packages
Compliance, Electrical, Fire Safety, Groundworks, Health & Safety
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Source descriptionPROTECTED STRUCTURE: RETENTION: We, TC Fumbally Properties Ltd, intend to apply for planning permission and retention permission at 27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure (referred to as a former laundry building under RPS Ref.: 5821). The proposed development consists of the following modifications to the permitted hotel development, permitted under Reg. Ref.: 4423/19 & ABP Ref.: 307217-20, as amended under Reg. Ref.: 4778/22 & ABP Ref.: 315887-23, which is currently under construction: Planning permission is sought for the following alterations: • Internal reconfiguration of the back of house areas at ground and first floor level of the existing building (Block A), a Protected Structure under RPS Ref.: 5821, including a revised linen store, provision of accessible staff bathroom, cleaning store kitchen and storage areas at ground floor level and staff facilities at first floor level. Provision of meeting rooms within the co-working area and residential communal kitchen at ground floor level. • Alterations to the previously permitted works to the façade to the Protected Structure including portion of existing wall to be retained, lowering of existing window cills at 2nd and 3rd floor level, retention of existing concrete supports for the 9 no. windows at ground floor level along New Row South and replacement of the stone with metal PPC flashing. • Reduction of the permitted louvered plant enclosure at roof level of Block A. • Internal reconfiguration of proposed ground floor level of Block B including provision of a resident’s gym and laundry, and management office at ground floor level. Relocation of accessible bedrooms within permitted floors from first to sixth floor level. • Elevational changes to Block B, the permitted 8 storey building, including reconfiguration of fenestration from first to seventh floor. • Revisions to the entrance lobby at ground floor level including glazing and gate. New escape door created at existing entrance. • Provision of a lightning protection system at roof level of Block B. • Revisions to the permitted bicycle store enclosure. Retention permission is sought for the following: • Reorientation of the multi-storey stair core of the 8 storey building to the southwest of the site. • Disassembly and rebuild of portion of the existing southern wall of the Protected Structure. • Reduction of the permitted building footprint at ground floor level which results in revisions to the substation and switch room, removal of a stair core / service area corridor and internal reconfiguration of the back of house, hotel reception and lounge area. The proposed alterations result in an overall decrease of 42 sq.m in the total GFA of the hotel from 7690 sq.m to 7648 sq.m.

EnergyFire / FSC likelyH&S triggerInfrastructureVacant / reuse signal

Source: Dublin City Council public planning register / source record not directly linked

Shannon Free Zone West, Clare

Block R, Shannon Free Zone West, Shannon Co. Clare

Clare County Council / Ref 2660284

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Shannon Free Zone West, Clare
Units / floor
3,172 m² (floor estimated)
Applicant
Shannon Commercial Enterprises DAC
Agent
O'Neill O'Malley Architects
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & SafetyMain contractor
Review recordGranted / Clare County Council
Status / decision
Granted / 24 Jun 2026
Authority / ref
Clare County Council / 2660284
Development facts
Infrastructure / 3,172 m² (floor estimated)
Likely packages
Compliance, Electrical, Fire Safety, Groundworks, Health & Safety
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 24 Jun 2026.

Source descriptionfor the proposed development which comprises revisions to previously granted permissions (Planning Ref: P20-575 and P23-224). The development includes the installation of an internal mezzanine first floor (3,172 m²) within the existing production area, providing additional general manufacturing and cleanroom space, together with ancillary office accommodation and staff welfare facilities. A new atrium is also proposed on the southern elevation to form a dedicated staff entrance. The development also provides for the extension of the existing service yard to accommodate a new sprinkler tank and pump station, in addition to a new three-storey external plant structure to house air handling units, associated plant, and containment enclosures. There is proposed back lit building signage to front and side elevations, alongside alterations to rear elevation. The external yard will include the construction of new single-storey service and storage buildings, along with a separate generator and transformer compound located adjacent to the existing substation. All associated site development works are included, comprising minor revisions to the existing car parking layout, the installation of palladian fencing to the perimeter of the yard with sliding access gates, and the provision of external plant compounds for gas bottle storage

EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Clare County Council public planning register / official file linked

Limerick

Dock Road & Saint Alphonsus Street, Limerick

Limerick City and County Council / Ref 267038

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Limerick
Units / floor
4,145 m² (floor estimated)
Applicant
Lidl Ireland GmbH
Agent
Jim Maneely
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanical
Review recordGranted / Limerick City and County Council
Status / decision
Granted / 12 Jun 2026
Authority / ref
Limerick City and County Council / 267038
Development facts
Infrastructure / 4,145 m² (floor estimated)
Likely packages
Compliance, Electrical, Groundworks, Health & Safety, Main contractor
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 12 Jun 2026.

Source descriptionExtension of Duration for Planning Ref. No. 20/457: the demolition of 3 no. warehousing/industrial/office buildings and associated structures (totalling 4,145 m² Gross Floor Area and ranging in height between one and three storey), the change of use of an existing single storey office building (Protected Structure No. 260) to café/coffee shop with associated internal alterations (109 m² Gross Floor Area) site development works and outdoor plaza seating area, and the construction of a Licenced Discount Foodstore of 3 storey equivalent height (2,715.9 m² Gross Floor Area) with undercroft and surface vehicular parking at ground floor, sales and checkout area with ancillary off-licence at first floor, and internal plant room at mezzanine second floor. The construction of the proposed Licenced Discount Foodstore will also include rooftop photovoltaic solar panel array (907.5 m²), corporate signage consisting of 3 no. building mounted corporate internally illuminated signs, 2 no. free standing internally illuminated flagpole signs, 2 no. wall mounted externally illuminated poster panel display boards and 1 no. externally illuminated poster display board, undercroft parking providing 53 no. car parking spaces, surface car park providing a total of 100 no. car parking spaces, (consisting of 8 no. disabled, 5 no. parent and child, 2 no. EV charging spaces and 85 no. regular) and 16 no. bicycle parking spaces, boundary treatments, hard and soft landscaping, services (including 1 no. below ground attenuation tank) and all other ancillary and associated site development works above and below ground level. Primary vehicular and pedestrian access to the proposed development will be provided via a new site entrance from Dock Road. Secondary vehicular and pedestrian access to the proposed development will be via the existing access off Saint Alphonsus Street, upgraded and enhanced as part of the proposed development. Pedestrian access to the proposed development will be further enhanced via a new plaza/public realm area along the north western boundary of the site with Dock Road, linking to the north eastern boundary of the site with Saint Alphonsus Street at the proposed café/coffee shop (Protected Structure No. 260) all on a site of approximately 0.76 hectares. The planning application is accompanied by a Natura Impact Statement (NIS)

EnergyH&S triggerInfrastructureVacant / reuse signal

Source: Limerick City and County Council public planning register / official file linked

Carrickmacross, Monaghan

St Louis Secondary School, Carrickmacross, Co Monaghan

Monaghan County Council / Ref 2660135

Our read

Named agent, contractor or delivery-party context gives a practical route into specification, pricing or follow-on package conversations.

SourceOfficial file: linked
Location
Carrickmacross, Monaghan
Units / floor
1,010 m² (floor estimated)
Applicant
the Board of Management St Louis Secondary School
Agent
Sebana Moynagh
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanical
Review recordGranted / Monaghan County Council
Status / decision
Granted / 25 Aug 2026
Authority / ref
Monaghan County Council / 2660135
Development facts
Infrastructure / 1,010 m² (floor estimated)
Likely packages
Compliance, Electrical, Groundworks, Health & Safety, Main contractor
Activity window
Post-decision watch: monitor contractor appointment, commencement notices and package timing.

Evidence / confidenceOfficial file: linked; card date 25 Aug 2026.

Source descriptionpermission for a development which will consist of the installation of a new predominantly two-storey school building, with a third-storey circulation core at 2nd floor level, and a new pedestrian access bridge from the existing carpark level to the 2nd floor level of the proposed new school building. The proposed development (1010 m²) includes 2 no. Mainstream Classrooms, 1 no. Science Lab & Prep Area, 2 no. Art Rooms; and all associated site and ancillary works The above proposed development consists of works within the curtilage of protected structures including: Convent of Saint Louis School Building (Reg No: 41310083); Convent of Saint Louis School Building (Reg No: 41310084); Convent of Saint Louis Church/Chapel (Reg No: 41310085); Saint Louis Convent National School (Reg No: 41310064); Convent of Saint Louis Stables (Reg No: 41310065); Saint Louis Convent/Nunnery (Reg No. 41310066); Convent of Saint Louis Gates/Railings/Boundary Walls (Reg No: 41310067); School House (Reg No: 41310072). There are also two recorded monuments within the curtilage of the proposed site: Fortified House and Bawn: Drummond Otra (Reg No. MO031-034)

H&S triggerInfrastructure

Source: Monaghan County Council public planning register / official file linked

Project mix

Stage, value and type mix

All records
Stages
Granted587New Application205Application Declared Invalid21Compliance Submission7S5 Dec Exempt5Invalid Application5
Estimated construction value

Few applications of this type have an estimated construction value.

Project types
Infrastructure739Energy117
What's changed

The newest record is dated 17 Nov 2026. These are counts from public records, not forecasts.

Major projects

Records to screen next

How to use this page

Find, check and follow projects

Find projects

Start with the newest planning records, then narrow by county or council when your area matters.

Check timing

Use decisions, appeals and site starts as separate timing clues.

Follow changes

Set an alert for new applications, decisions, appeals and site starts of this type.