Notified commencement · 2015-11-14
The proposed development represents Phase 2 of Alexion’s biopharmaceutical manufacturing campus and includes 6 no. buildings with a total floor area of 30,994 square metres, together with external utility areas and associated site works. The development provides for the following:- a four-storey 21,869 square metre and 42.5 metre high manufacturing building including intermediate level mezzanines and boiler flue stack (to 48.5 metres height); a single-storey 3,626 square metre and 16 metre high warehouse extension; a two-storey 4,563 square metre and 13.5 metre high central utilities building; a utilities yard and wastewater treatment area. The ancillary external utilities within the utility yard will consist of; a single storey control building, single storey pump house, single-storey drum storage building, single storey electrical building, process water and waste water storage tanks, bunded water treatment chemical tanks, bunded fuel storage tank and back-up electrical generators; each of these facilities will be accessible via a single-storey internal access corridor running through the spine of the campus with elevated utility rack. The development also includes:- a staff entrance lobby extension to the western elevation of the Phase 1 internal access corridor; car parking for an additional 220 vehicles; an electrical substation building with separate access off Cruiserath Road; continued provision of temporary construction access off Cruiserath Road to be maintained as
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.